INSP-Final Inspection | 7/7/2006 | 7/10/2006 | 7/10/2006 | A | PASS |
Forrest France
|
|
|
Fire sprinkler passed final inspection.
|
INSP-Sprinkler Rough-in/Hydro | 7/5/2006 | 7/6/2006 | 7/6/2006 | A | PART |
Forrest France
|
|
|
OH rough-in for the area as marked on approved plans is good for cover at the drop ceilings.
|
INSP-Final Inspection | 5/16/2006 | 5/18/2006 | 5/18/2006 | P | PART |
Forrest France
|
|
|
Fire sprinkler for the west half of the remodel area under the scope of work passed final inspection.
|
Plan assigned to (Bill) | 4/26/2006 | | 5/4/2006 | | DONE |
Bill Alexander
|
|
|
|
Sprinkler Plan Check | 4/26/2006 | | 5/4/2006 | | PASS |
Bill Alexander
|
|
|
Major plan modifications.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/4/2006 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 5/4/2006 | | DONE |
|
|
|
|
Telephone call | | | 5/4/2006 | | DONE |
|
|
|
tlk to brodie ###-#### that pemit and fees are ready to be picked up
|
Permit Ready to Issue | | | 5/4/2006 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 5/4/2006 | | DONE |
|
|
|
|
Issue and Print Permit | | | 5/4/2006 | | DONE |
|
|
|
|
INSP-Sprinkler Rough-in | 5/1/2006 | 5/2/2006 | 5/2/2006 | P | PART |
Forrest France
|
|
|
Overhead rough-in is good for cover at the drop ceiling areas as marked on approved plans, two rooms at the NE corner are not complete or inspected at this time.
|
INSP-Sprinkler Rough-in | 4/26/2006 | 4/26/2006 | 4/27/2006 | P | PART |
Forrest France
|
|
|
Overhead sprinkler is approved for cover at the areas as marked on stamped plans.
|
Plan resubmittals received | | | 4/26/2006 | | |
|
|
|
|
INSP-Sprinkler Rough-in/Hydro | 4/17/2006 | 4/17/2006 | 4/17/2006 | P | PART |
Troy Cobbley
|
|
|
Heads in hard lids as marked on plans is ok to cover.
|
INSP-Sprinkler Rough-in/Hydro | 4/6/2006 | 4/7/2006 | 4/7/2006 | A | PART |
Troy Cobbley
|
|
|
Piping above the hardlid areas as marked on plans is ok to cover.
|
Issue and Print Permit | | | 3/27/2006 | | DONE |
|
|
|
|
Plan assigned to (Bill) | 2/27/2006 | | 3/24/2006 | | DONE |
|
|
|
|
Sprinkler Plan Check | 3/7/2006 | | 3/24/2006 | | PASS |
Bill Alexander
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/24/2006 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 3/24/2006 | | 3/24/2006 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 3/24/2006 | | |
|
|
|
|
Telephone call | | | 3/24/2006 | | DONE |
|
|
|
left mess that permit is ready
|
Plan resubmittals received | | | 3/7/2006 | | DONE |
|
|
|
|
Application received | | | 2/27/2006 | | |
|
|
|
|