INSP-Final Inspection | 4/18/2006 | 4/19/2006 | 4/19/2006 | A | PASS |
Forrest France
|
|
|
Fire sprinkler permit finaled.
|
INSP-Final Inspection | 4/4/2006 | 4/5/2006 | 4/5/2006 | P | FAIL |
Troy Cobbley
|
|
|
Pendent heads have been oversprayed with texture, the DSW head at the patio is covered in stucco and is missing an escutcheon.
|
INSP-Sprinkler Rough-in | 3/8/2006 | 3/10/2006 | 3/10/2006 | A | PART |
Forrest France
|
|
|
Overhead rough-in is good for cover at the new board room, final pending installation of ceiling and escutcheons.
|
Plan assigned to (Bill) | 2/24/2006 | | 3/1/2006 | | DONE |
Bill Alexander
|
|
|
|
Sprinkler Plan Check | 2/24/2006 | | 3/1/2006 | | PASS |
Bill Alexander
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/1/2006 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 3/1/2006 | | |
|
|
|
|
Inspection Record Card- Fire | 3/1/2006 | | 3/1/2006 | | DONE |
|
|
|
|
Telephone call | | | 3/1/2006 | | |
|
|
|
Informed Crystal (Treasure Valley Fire Protection) ###-#### to pick up permit 3-1-06 eus
|
Issue and Print Permit | | | 3/1/2006 | | DONE |
|
|
|
|
Application received | | | 2/24/2006 | | |
|
|
|
|