INSP-Final Inspection | 4/12/2006 | 4/12/2006 | 4/13/2006 | P | PASS |
Forrest France
|
|
|
Fire sprinkler permit finaled.
|
INSP-Sprinkler Rough-in/Hydro | 4/12/2006 | 4/12/2006 | 4/12/2006 | P | PART |
Forrest France
|
|
|
Fire sprinkler work is satisfactory, contractor to install head cages at the uprights below the ductwork as heads at this location are subject to mechanical damage due to height AFF.
|
Plan assigned to (Bill) | 3/1/2006 | | 3/8/2006 | | DONE |
|
|
|
|
Sprinkler Plan Check | 3/8/2006 | | 3/8/2006 | | PASS |
Troy Cobbley
|
|
|
Plans approved with no written comments. Field inspector to verify.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/8/2006 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 3/8/2006 | | |
|
|
|
|
Inspection Record Card- Fire | 3/8/2006 | | 3/8/2006 | | DONE |
|
|
|
|
Telephone call | | | 3/8/2006 | | |
|
|
|
Informed Greg Patrick (Treasure Valley Fire Protection) ###-#### to pick up permit 3-8-06 eus
|
Issue and Print Permit | | | 3/8/2006 | | DONE |
|
|
|
|
Application received | | | 3/1/2006 | | |
|
|
|
|