INSP-Final Inspection | 5/26/2006 | 5/30/2006 | 5/30/2006 | A | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Final Inspection | 5/25/2006 | 5/26/2006 | 5/26/2006 | A | FAIL |
Forrest France
|
|
|
The DP in the east side cooler is blocked by a surface mounted fan cooling unit, one head in the east dining area directly in front of a heat diffuser needs to be intermediate temp. rating, missing escutcheon at kitchen hallway east exit, provide signage for antifreeze riser, provide 200 deg. ssu for the head box, still need to test sprinkler related alarms and tampers at the riser.
|
INSP-Sprinkler Rough-in/Hydro | 5/16/2006 | 5/17/2006 | 5/17/2006 | P | PASS |
Troy Cobbley
|
|
|
Sprinkler piping located above the layin ceilings is ok to be covered. The two additional heads in the concealed pockets have been installed.
|
INSP-Supply line flush | 5/16/2006 | 5/17/2006 | 5/17/2006 | P | PASS |
Troy Cobbley
|
|
|
Underground hydro test passed.
|
INSP-Sprinkler Rough-in/Hydro | 4/11/2006 | 4/11/2006 | 4/11/2006 | P | PASS |
Troy Cobbley
|
|
|
Need to provide additional upright sprinklers as discussed in the dormer pockets and the pocket found below the decking near the main entrance. Piping is ok to cover. These items can be verified at final.
|
Issue permit | | | 3/24/2006 | | DONE |
|
|
|
|
Plan assigned to (Bill) | 3/2/2006 | | 3/23/2006 | | DONE |
|
|
|
|
Sprinkler Plan Check | 3/2/2006 | | 3/23/2006 | | PASS |
Bill Alexander
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/23/2006 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 3/23/2006 | | 3/23/2006 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 3/23/2006 | | |
|
|
|
|
Telephone call | | | 3/23/2006 | | |
|
|
|
called ###-#### and left voicemessage that permit is ready and fees
|
Case Summary | | | 3/2/2006 | | DONE |
|
|
|
|
Application received | | | 3/2/2006 | | |
|
|
|
|