INSP-Final Inspection | 4/4/2006 | 4/5/2006 | 4/5/2006 | P | PASS |
Troy Cobbley
|
|
|
Fire sprinkler work is satisfactory, permit finaled.
|
INSP-Sprinkler Rough-in/Hydro | 3/17/2006 | 3/21/2006 | 3/21/2006 | A | PART |
Forrest France
|
|
|
Overhead rough-in is good for cover, annular space above ceiling to be entirely filled with non-combustible insulation to meet exception of NFPA 13 2002.
|
Plan assigned to (Bill) | 3/2/2006 | | 3/8/2006 | | DONE |
|
|
|
|
Sprinkler Plan Check | 3/3/2006 | | 3/8/2006 | | PASS |
Troy Cobbley
|
|
|
Plans approved with no written comments. Field inspector to verify.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/8/2006 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 3/8/2006 | | |
|
|
|
|
Inspection Record Card- Fire | 3/8/2006 | | 3/8/2006 | | DONE |
|
|
|
|
Telephone call | | | 3/8/2006 | | |
|
|
|
Informed Jeff Anderson (Treasure Valley Fire Protection) ###-#### to pick up permit 3-8-06 eus
|
Issue and Print Permit | | | 3/8/2006 | | DONE |
|
|
|
|
Application received | | | 3/2/2006 | | |
|
|
|
|