INSP-Final Inspection | 4/11/2006 | 4/12/2006 | 4/12/2006 | A | PASS |
Forrest France
|
|
|
Required corrections have been made, fire sprinkler permit finaled.
|
INSP-Final Inspection | 4/11/2006 | 4/11/2006 | 4/11/2006 | P | DEFR |
Forrest France
|
|
|
Scheduled by a contractor via Hello! on 4/11/2006 at 8:35:37 AM. Contact: ###-####.
|
INSP-Final Inspection | 3/22/2006 | 3/22/2006 | 3/23/2006 | P | FAIL |
Troy Cobbley
|
|
|
Need ceiling tile installed to final
|
INSP-Sprinkler Rough-in/Hydro | 3/22/2006 | 3/22/2006 | 3/23/2006 | P | PASS |
Troy Cobbley
|
|
|
sprinkler piping is ok to cover
|
Plan assigned to (Bill) | 3/6/2006 | | 3/8/2006 | | DONE |
|
|
|
|
Sprinkler Plan Check | 3/6/2006 | | 3/8/2006 | | PASS |
Troy Cobbley
|
|
|
Plans approved with no written comments. Field verify.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/8/2006 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 3/8/2006 | | |
|
|
|
|
Inspection Record Card- Fire | 3/8/2006 | | 3/8/2006 | | DONE |
|
|
|
|
Telephone call | | | 3/8/2006 | | |
|
|
|
Informed Jeff Anderson (Treasure Valley Fire Protection) ###-#### to pick up permit 3-8-06 eus
|
Issue and Print Permit | | | 3/8/2006 | | DONE |
|
|
|
|
Application received | | | 3/6/2006 | | |
|
|
|
|