INSP-Final Inspection | 9/12/2006 | 9/13/2006 | 9/13/2006 | P | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Sprinkler Rough-in/Hydro | 5/15/2006 | 5/16/2006 | 5/16/2006 | P | PART |
Troy Cobbley
|
|
|
hydrotest passed. Sprinkler rough-in passed. Dprinkler heads still need to be installed and the riser finished
|
Issue and Print Permit | | | 4/6/2006 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 3/30/2006 | | DONE |
|
|
|
|
Telephone call | | | 3/30/2006 | | |
|
|
|
called ###-#### and told Rick that permit is ready and fee
|
Plan assigned to (Bill) | 3/10/2006 | | 3/29/2006 | | DONE |
|
|
|
|
Sprinkler Plan Check | 3/10/2006 | | 3/29/2006 | | PASS |
Bill Alexander
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/29/2006 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 3/29/2006 | | 3/29/2006 | | DONE |
|
|
|
|
Case Summary | | | 3/10/2006 | | |
|
|
|
|
Application received | | | 3/10/2006 | | |
|
|
|
|