INSP-Final Inspection | 8/30/2006 | 9/1/2006 | 9/1/2006 | A | PASS |
Forrest France
|
|
|
Fire alarm passed field inspection, permit finaled.
|
FIR-Aging Inspection | 7/18/2006 | 7/18/2006 | 7/18/2006 | | NR |
Troy Cobbley
|
|
|
work is in progress
|
Plan assigned to (Mary) | 3/15/2006 | | 4/18/2006 | | DONE |
|
|
|
|
Alarm Plan Check | | | 4/18/2006 | | PASS |
|
|
|
To provide a sprinkler monitoring fire alarm system to a new structure.
4/18/2006 - Additional scope is to add five (5) duct smoke detectors for HVAC shutdown (comment #17.)
The associated building permit (BLD 05-02381) is to construct a new 34,160 square foot, one story office, retail and warehouse building with a 2,660 square foot mezzanine and related site improvements. This building will be constructed of concrete tilt-up exterior walls, concrete slab floor, steel mezzanine floor and building roof joists and metal studs. All construction per the approved plans and attached comment list. (warehouse: 25,760 sq. ft., showroom 3,500 sq. ft., office: 4,900 sq. ft.) JCM Johnstone Supply -
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/18/2006 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 4/18/2006 | | 4/18/2006 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 4/18/2006 | | DONE |
|
|
|
|
Telephone call | | | 4/18/2006 | | DONE |
|
|
|
left mess that permit is ready
|
Issue permit | | | 4/18/2006 | | DONE |
|
|
|
|
Plan resubmittals received | | | 4/12/2006 | | |
|
|
|
|
Alarm Plan Check | | | 3/23/2006 | | FAIL |
|
|
|
resubmittal required. Faxed comments to Dave Maxwell and Thad Mason.
|
Application received | | | 3/15/2006 | | |
|
|
|
|
Case Summary | | | 3/15/2006 | | |
|
|
|
|