Permit NumberFIR06-00194
StatusFinaled
Name PROTEX
Site Address 1549 N CORMORANT PL
Project Namealm - Holbrook; Mortgage Co
Customer Number 
ePlanReview 
Description
FIR06-00158 is to provide a sprinkler monitoring fire alarm system that includes HVAC shutdown for RTU 6 and 7.

FIR06-00194 is to provide HVAC shutdown for five (5) additional RTUs to the existing required sprinkler monitoring system. FIR06-00158 must be finaled prior to occupancy.

FIR06-00158 is associated with building permit (BLD 05-02746) which is to build a new 15,500 square foot, one story, steel and wood framed retail and office shell building and related site improvements. This building is fully fire sprinklered. The sprinklers are used for area increase. This is a shell building only and no occupancy is allowed under this permit. Separate tenant improvement permits are required to finish this building for occupancy. All construction per the approved plans and attached comment list. JCM Holbrook Building (Shell) -

FIR06-00194 is associated with building permit (BLD 05-02752) which is to finish a new 3,350 square foot office tenant space. This is tenant space "A" in the new Holbrook Shell Building. These tenant spaces are being separated by two-hour fire-resistive demising walls. These walls are per the approved plans and are not code required. This building is fully fire sprinklered for area increase. All construction per the approved plans and attached comment list. JCM The Mortgage Company (Tenant Improvement) -

Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection6/26/20066/26/20066/27/2006PPASS
DetailsTroy Cobbley
permit finaled
INSP-Final Inspection6/22/20066/23/20066/23/2006AFAIL
DetailsTroy Cobbley
Need the correct sample tubes and namometer tests of the duct detectors.
INSP-Final Inspection6/20/20066/21/20066/21/2006AFAIL
DetailsTroy Cobbley
Need gas for the hvac units to verify shutdown and the nfpa 72 record of completion forms. All other items including signals passed.
Issue and Print Permit  4/4/2006 DONE
Inspection Record Card- Fire4/3/2006 4/3/2006 DONE
Telephone call  4/3/2006 DONE
called ###-#### and left voicemessage for Rob that permit is ready and fee
Permit Ready to Issue  4/3/2006 DONE
Alarm Plan Check  3/31/2006 PASS
Approved pending field inspection of fire alarm permit comments.
PLANS/APPL TAKEN TO FRONT DESK  3/31/2006 DONE
Plan assigned to (Mary)3/21/2006 3/31/2006 DONE
Plan resubmittals received  3/24/2006 DONE
Application received  3/21/2006  
Alarm Plan Check  3/21/2006 FAIL
Resubmittal required. Faxed comments to Rob Ahten.