INSP-Final Inspection | 5/30/2006 | 5/30/2006 | 5/30/2006 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Final Inspection | 5/23/2006 | 5/24/2006 | 5/24/2006 | A | FAIL |
Troy Cobbley
|
|
|
Can't final until the ceiling tile is installed. Sprinkler piping is ok to cover.
|
Plan assigned to (Bill) | 3/21/2006 | | 3/24/2006 | | DONE |
|
|
|
|
Sprinkler Plan Check | 3/21/2006 | | 3/24/2006 | | PASS |
Bill Alexander
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/24/2006 | | DONE |
|
|
|
|
Case Summary | | | 3/24/2006 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 3/24/2006 | | 3/24/2006 | | DONE |
|
|
|
|
Telephone call | | | 3/24/2006 | | DONE |
|
|
|
called ###-####, Catherine is no longer with the company so left message with Alicia that permit is ready and fee
|
Issue and Print Permit | | | 3/24/2006 | | |
|
|
|
|
Application received | | | 3/21/2006 | | |
|
|
|
|