Permit Information
Permit NumberFIR06-00197
StatusFinaled
Name SIMPLEX/GRINNELL
Site Address 600 N ROBBINS RD
Project Namealm - IDAHO ELKS REHAB - POD C
Customer Number 
ePlanReview 
Description
To relocate a chime/strobe to provide total notification in the TI space. Provide a new smoke detector in Dictation (A10006) for total area detection. The PDS Fire Inspector to field verify total visual coverage in the waiting room. If additional appliances are required, a resubmittal will be necessary. No written comments. Battery calculations appear to be sufficient. Provide revised building map, including any architectural changes to the PDS Fire Inspector at time of inspection.

The associated building permit (BLD05-02400) is to change existing medical office's and reception areas into a medical treatment room and new reception areas (Pod C). Pod B, remove existing storage millwork and infill between two existing work stations with new millwork to match existing for third work station and add millwork for two new storage areas. Work includes selective demolition, interior millwork, finishes and equipment. A "Letter of Compliance is required for this project as evidence of final inspections and approvals for this project scope. NOTE: Any modifications to the existing sprinkler and alarm systems require separate permits and shall comply with the 2003 IFC. (drs) (IDAHO ELKS REHAB HOSPITAL-INTERMOUNTAIN ORTHOPEDICS-1ST FLR) - Pod B & C remodel.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection4/27/20064/28/20064/28/2006APASS
DetailsTroy Cobbley
Permit finaled
Issue and Print Permit  4/4/2006 DONE
Plan assigned to (Mary)3/21/2006 4/3/2006 DONE
Alarm Plan Check  4/3/2006 PASS
Approved pending PDS Fire Inspector field verification. No comments written.
PLANS/APPL TAKEN TO FRONT DESK  4/3/2006 DONE
Inspection Record Card- Fire4/3/2006 4/3/2006 DONE
Permit Ready to Issue  4/3/2006  
Telephone call  4/3/2006 DONE
left mess that permit is ready
Case Summary  3/21/2006 DONE
Application received  3/21/2006