Permit Information
Permit NumberFIR06-00199
StatusFinaled
Name HONEYWELL INC
Site Address 190 E BANNOCK ST
Project Namealm - ST LUKES
Customer Number 
ePlanReview 
Description
To provide two new NAC panels (to be located in the Fire Closet on the 3rd floor), total area coverage in the space as indicated on the plans, four (4) duct detectors for HVAC shutdown (AHU-1 and -2 supply and return). Seven (7) fire/smoke dampers and ten (10) sets of door hope-opens will be added to existing control circuits.

The building permit BLD05-02430 is to remodel approximately 5,200 sq.ft. of space in hospital treatment areas per approved plans. Work includes selective interior demolition; construction of non-combustible, non-bearing walls to create accessible restrooms, locker and break areas; four Ultrasound rooms and support area; two Radiation rooms & support areas; a Chest room and Administrative Offices; to maintain exit egress paths and upgrade electrical, mechanical, plumbing, sprinkler and alarm systems to meet tenant needs and comply with current adopted codes and ordinances. (drs) (ST LUKES-N & CENTRAL WING-1ST FLR-GN ULTRASOUND)
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection4/18/20074/19/20074/19/2007PPASS
DetailsForrest France
Corrections verified for completion, final fire alarm inspection passed, permit finaled.
INSP-Final Inspection4/13/20074/16/20074/16/2007PFAIL
DetailsForrest France
Strobe notification devices at intermittent areas failed to function properly during alarm testing.
INSP-Final Inspection7/11/20067/12/20067/12/2006APART
DetailsTroy Cobbley
This inspection was for the MI Waiting room and the Reception area only. Fire alarm passed in this area. The double doors that enter the reception area did not latch completely upon release of the door holders and will need to be reverified at final.
INSP-Final Inspection5/17/20065/18/20065/18/2006PPART
DetailsForrest France
Fire alarm testing for the area of remodel designated as phase one is acceptable as marked on approved plans, one duct detector has the sample and vent tubes installed backward, need to test the manual pull at the nurses station, will verify these items at next inspection for the remainder of the project scope.
Issue and Print Permit  4/10/2006 DONE
Plan assigned to (Mary)3/22/2006 4/6/2006 DONE
Alarm Plan Check  4/6/2006 PASS
Approved pending field inspection of fire alarm permit comments.
PLANS/APPL TAKEN TO FRONT DESK  4/6/2006 DONE
Inspection Record Card- Fire4/6/2006 4/6/2006 DONE
Permit Ready to Issue  4/6/2006 DONE
Telephone call  4/6/2006 DONE
lft vm with jim shilton ###-#### that permit and fees are ready to be picked up
Case Summary  3/22/2006 DONE
Application received  3/22/2006