INSP-Final Inspection | 5/25/2006 | 5/26/2006 | 5/26/2006 | A | PASS |
Forrest France
|
|
|
Scheduled by a contractor via Hello! on 5/25/2006 at 2:48:08 PM. Contact: ###-####.
|
DOC - Permit Finaled | | | 5/26/2006 | | DONE |
|
|
|
|
INSP-Sprinkler Rough-in/Hydro | 5/24/2006 | 5/25/2006 | 5/25/2006 | P | PASS |
Troy Cobbley
|
|
|
Need eschuesions then can be finaled.
|
INSP-Sprinkler Rough-in/Hydro | 5/22/2006 | 5/23/2006 | 5/24/2006 | P | FAIL |
Forrest France
|
|
|
The portion of install at the two new heads in the basement soffit has been concealed prior to inspection, also need to provide as-builts reflecting field changes for piping supply to new heads.
|
Plan assigned to (Bill) | 3/24/2006 | | 4/14/2006 | | DONE |
|
|
|
|
Sprinkler Plan Check | 3/24/2006 | | 4/14/2006 | | PASS |
Bill Alexander
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/14/2006 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 4/14/2006 | | 4/14/2006 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 4/14/2006 | | DONE |
|
|
|
|
Telephone call | | | 4/14/2006 | | DONE |
|
|
|
lft vm for roger adams ###-#### that permit and fees are ready to be picked up
|
Issue and Print Permit | | | 4/14/2006 | | DONE |
|
|
|
|
Case Summary | | | 3/24/2006 | | DONE |
|
|
|
|
Application received | | | 3/24/2006 | | |
|
|
|
|