INSP-Final Inspection | 3/16/2010 | 3/16/2010 | 3/16/2010 | P | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Sprinkler Rough-in/Hydro | 5/9/2006 | 5/10/2006 | 5/10/2006 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Sprinkler Rough-in/Hydro | 4/18/2006 | 4/18/2006 | 4/18/2006 | P | PASS |
Troy Cobbley
|
|
|
sprinkler piping is ok to cover
|
INSP-Sprinkler Rough-in/Hydro | 4/12/2006 | 4/14/2006 | 4/14/2006 | A | PASS |
Troy Cobbley
|
|
|
Inspection was for the rough-in of the drops and hangers. No pendants have been installed yet and their individual armovers will need to be inspected prior to all tile being installed.
|
Plan assigned to (Bill) | 3/24/2006 | | 3/27/2006 | | DONE |
|
|
|
|
Sprinkler Plan Check | 3/24/2006 | | 3/27/2006 | | PASS |
Bill Alexander
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/27/2006 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 3/27/2006 | | 3/27/2006 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 3/27/2006 | | |
|
|
|
|
Telephone call | | | 3/27/2006 | | DONE |
|
|
|
left mess that permit is ready
|
Issue and Print Permit | | | 3/27/2006 | | DONE |
|
|
|
|
Application received | | | 3/24/2006 | | |
|
|
|
|
Inspection Record Card- Fire | 3/27/2006 | | | | |
|
|
|
|