Permit Information
Permit NumberFIR06-00218
StatusFinaled
Name DEBEST FIRE PROTECTION
Site Address 1889 N WILDWOOD AVE
Project NameSPR TED MASON SIG HOMES
Customer Number 
ePlanReview 
Description
(TED MASON SIGNATURE HOMES - CONDO UNITS 22 & 23 BUILDING #3) This building is fire sprinklered for story increase and for fire flow. To modify a shell system by adding and relocating fire sprinklers for a new 5,139-ft/2, 2 story office tenant space (2,675 square foot 1st floor and 2,464-ft/2 2nd floor) within an existing 5,550-ft/2 foot print building. The shell was constructed as a one story building under permit BLD05-01262. Fire sprinkler work is related to the installation of steel columns, wood beams, wood floor joists, interior walls, shear walls, four restrooms and suspended ceilings. This fire protection work shall comply with the IFC 2003 and the permit review comments; each regulated by the Fire Chief. The review comments, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. The shell fire sprinklers were permitted under FIR06-00161. This permit is attached to BLD05-03298.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection9/13/20069/15/20069/15/2006APASS
DetailsTroy Cobbley
Permit finaled
INSP-Sprinkler Rough-in/Hydro8/28/20068/29/20068/29/2006APASS
DetailsTroy Cobbley
The remaining piping on the first floor is ok to cover. Two additional upright sprinkler heads are required as discussed due to duct blockage. Their placement will be verified at the final.
INSP-Sprinkler Rough-in/Hydro8/24/20068/25/20068/25/2006PPART
DetailsTroy Cobbley
The second floor sprinkler piping is ok to cover.
INSP-Sprinkler Rough-in/Hydro7/24/20067/24/20067/24/2006PPASS
DetailsTroy Cobbley
Hydro test of the FDC passed.
INSP-Final Inspection7/20/20067/21/20067/21/2006AFAIL
DetailsTroy Cobbley
Still need to hydro test the FDC and connect/test the alarms. Forward flush passed. The rough-in for the south tenant failed due to numerous obstructions to the upright sprinkler heads by duct work.
INSP-Sprinkler Rough-in/Hydro7/20/20067/21/20067/21/2006APASS
DetailsTroy Cobbley
Above ground hydro test passed. Still need to hydro the remote FDC.
INSP-Supply line flush6/28/20066/29/20066/29/2006PPASS
DetailsTroy Cobbley
underground supply line flushed passed
INSP-Sprinkler Rough-in/Hydro6/14/20066/15/20066/15/2006PPASS
DetailsTroy Cobbley
Piping understairs, above restroom and entry lobby ok to cover.
INSP-Sprinkler Rough-in/Hydro6/14/20066/16/20066/14/2006PCANC
DetailsTroy Cobbley
Contact is Jeff Chaney; Phone #: ###-#### Internet Inspection Request from: Alicia Pauley Inspection cancelled from web by: Alicia Pauley
INSP-Sprinkler Rough-in/Hydro6/12/20066/12/20066/13/2006PPASS
DetailsTroy Cobbley
200lb Hydro Test Passed
Plan assigned to (Bill)3/28/2006 5/1/2006 DONE
Sprinkler Plan Check4/10/2006 5/1/2006 PASS
DetailsBill Alexander
PLANS/APPL TAKEN TO FRONT DESK  5/1/2006 DONE
Inspection Record Card- Fire5/1/2006 5/1/2006 DONE
Permit Ready to Issue  5/1/2006 DONE
Telephone call  5/1/2006  
called ###-#### and left message for Randy Bowron that permit is ready and fee
CHANGE STATUS TO (ISS)  5/1/2006 DONE
(F) Reprint permit  5/1/2006 DONE
INSP-Sprinkler Rough-in/Hydro4/27/20064/27/20064/27/2006PPASS
DetailsTroy Cobbley
The remaining portion of the underground is ok to cover
Plan resubmittals received  4/10/2006 DONE
DetailsBill Alexander
Telephone call  4/5/2006 DONE
4/5/2006 - SLR to Gordon Goldsmith - I spoke with Randy this morning regarding your email below. After a little questioning from me as to the real reason for their problem, I suggested several alternative methods of providing the valving. As he started to look at their design closer, he acknowledged that he thought he could see a solution and he will go back and discuss it with his designer. My guess is that they will find a way to put the valve in. If they can't, I told him he would need to bring in the sprinkler piping plans, including floor plans and elevations and sections, which clear show what it is that prevents any control valve from being installed, and then we would have a basis for a discussion. He agreed to do that if necessary.
So you're off the hook for now, Gordon.
Sam

>>> GORDON GOLDSMITH 4/4/2006 5:45 PM >>>
Sam, I had a lengthy discussion with Randy at DeBest. He is asking for the FM to approve the omission of the second floor control valve, (BCC Chapter 7- 903.1.5), because of lack of space and other issues. The core/shell BLD 05-01262 FIR 06-00161 approved by Bill A. and FIR 06-00218, 219, and 220 that were disapproved. Address is 1897 Wildwood the Ted Mason Building. Randy was lobbying hard for my approval, he assured me that if there was an alternative he would not be calling the FM making this request. Obviously I am stepping in this position w/o any history or information regarding this issue. I have deferred him back to you regarding his building construction issue. If after talking to Randy you could advice Chief Hanneman or myself, an informed decision could be made. Thanks Sam for you help!
Issue and Print Permit  3/31/2006 DONE
Sprinkler Plan Check3/9/2006 3/30/2006 FAIL
DetailsBill Alexander
Re-Submittals Of The Following Items Are Required:
1. Floor control assemblies are required for any building 2 or more levels in height. Revise and resubmit. (BMC 7-01-55 IFC 903.1.5)
Miscellaneous action  3/30/2006 DONE
Took permit documents to permit desk for returning.
Telephone call  3/30/2006 DONE
called ###-#### and left message for Randy with Alicia permit failed needs picked up
Application received  3/28/2006  
Case Summary  3/28/2006