INSP-Final Inspection | 4/13/2007 | 4/16/2007 | 4/16/2007 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Final Inspection | 2/6/2007 | 2/7/2007 | 2/7/2007 | P | FAIL |
Troy Cobbley
|
|
|
Need to have the pendant within 12" of the riser and the piping under the floor is still not insulated.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/5/2007 | | |
|
|
|
|
Telephone call | | | 2/5/2007 | | DONE |
|
|
|
tlk to secretary with shilo auto ###-#### that permit and fees are ready to be picked up
|
Permit Ready to Issue | | | 2/5/2007 | | DONE |
|
|
|
|
(F) Reprint permit | | | 2/5/2007 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 2/5/2007 | | DONE |
|
|
|
|
Sprinkler Plan Check | 1/25/2007 | | 2/1/2007 | | PASS |
|
|
|
Plan review by Bryan Johnson As-Built are Approved
|
Plan resubmittals received | | | 1/25/2007 | | |
|
|
|
|
INSP-Final Inspection | 1/16/2007 | 1/17/2007 | 1/17/2007 | P | FAIL |
Troy Cobbley
|
|
|
There are still alot of problems. To start with the resubmitted plans do not show all of the added heads. One head is missing in the dining area. Another head is too close to a ornamental wood piece above a door. Neither the fitter or I could dislodge the access panel to the crawl space to verify pipe size and insulation as previously marked. There was no head within 12" of the riser. The riser is too far from the wall. No supply pressure guage was installed. The test and drain was not ran to the exterior. Plans need to be resubmitted with all of the information provided. Underground flush passed.
|
INSP-Final Inspection | 1/11/2007 | 1/16/2007 | 1/16/2007 | P | CANC |
Troy Cobbley
|
|
|
Per contractor the project is not ready for a final inspection
|
Permit Ready to Issue | | | 1/11/2007 | | |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 1/11/2007 | | |
|
|
|
picking up permit
|
Inspection Record Card- Fire | 1/10/2007 | | 1/10/2007 | | DONE |
|
|
|
|
Sprinkler Plan Check | 1/8/2007 | | 1/10/2007 | | PASS |
|
|
|
Plan review by Bryan Johnson
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/10/2007 | | DONE |
|
|
|
|
Case Summary | | | 1/4/2007 | | |
|
|
|
|
INSP-Final Inspection | 12/22/2006 | 12/22/2006 | 12/22/2006 | P | CANC |
Troy Cobbley
|
|
|
Call Mike Beiman First before you head out. Merry Christmas Forrest - RK Internet Inspection Request from: Trent Bice Inspection cancelled from web by: Trent Bice
|
INSP-Final Inspection | 12/15/2006 | 12/18/2006 | 12/18/2006 | P | CANC |
Troy Cobbley
|
|
|
Per fitter the job is not ready for inspection. I notified him per my previous inspection entry that resubmittals were going to be required and that the computer showed no record of that being done.
|
INSP-Sprinkler Rough-in/Hydro | 5/2/2006 | 5/2/2006 | 5/2/2006 | P | PART |
Troy Cobbley
|
|
|
Sprinkler piping is ok to cover. Tenting passed. The riser has not been installed yet. The 1 1/4" piping that passes under the floor has not been insulated yet. Upon review of the plan review notes many items had not been addressed by the contractor and are left for field inspector to verify. I made a phone call to Bill Alexander and went over the items and it was decided that a resubmittal will be required. Much of the items concern the supply from the street. Other items include the added heads due to lights. One additional head will be required under the stairs due to obstructions. I notified Scott with Shilo of all of these items.
|
Plan assigned to (Bill) | 3/28/2006 | | 4/20/2006 | | DONE |
|
|
|
|
Sprinkler Plan Check | 3/28/2006 | | 4/20/2006 | | PASS |
Bill Alexander
|
|
|
Some site verification required (referenced on review comments).
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/20/2006 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 4/20/2006 | | 4/20/2006 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 4/20/2006 | | DONE |
|
|
|
|
Telephone call | | | 4/20/2006 | | DONE |
|
|
|
lft for trent bice ###-#### that permit and fees are ready to be picked up
|
Issue and Print Permit | | | 4/20/2006 | | DONE |
|
|
|
|
Application received | | | 3/28/2006 | | |
|
|
|
|