Permit Information
Permit NumberFIR06-00229
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 1900 S COLE RD
Project NameSPR COMMERCIAL TIRE ADDITION
Customer Number 
ePlanReview 
Description
COMMERCIAL TIRE - BUILDING ADDITION * To install and extension of and an existing wet system into a new 3,520-ft/2, one story addition located on the east side of the existing 11,035-ft/2, one story Commercial Tire, retail and auto repair building. Fire sprinkler work is related to the riser being modified with the installation of a new wall P.I. attached to a new backflow preventer, system piping with ESFR protection in the attached new masonry exterior walls, concrete slab floor and metal roof building addition which will be used to for wheel alignment work and tire storage. Related building permit work (no sprinkler work identified) includes the remodel of the existing men's and women's restroom. This building will be fully fire sprinklered. This fire protection work shall comply with the IFC 2003 and the permit review comments; each regulated by the Fire Chief. The review comments, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. This permit is attached to BLD05-02812.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection5/5/20065/5/20065/5/2006PPASS
DetailsTroy Cobbley
Fire sprinklers finaled
INSP-Sprinkler Rough-in/Hydro5/4/20065/4/20065/4/2006PPASS
DetailsTroy Cobbley
Permit is ok to final when the fire alarm permit is finaled.
INSP-Sprinkler Rough-in/Hydro5/3/20065/4/20065/4/2006ACANC
DetailsTroy Cobbley
jim; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles reshedule for pm
INSP-Sprinkler Rough-in/Hydro5/3/20065/3/20065/3/2006PPASS
DetailsTroy Cobbley
Above ground hydro test passed. I performed a partial rough-in inspection. The EFSR heads were too close to the truss webbing. Some EQ bracing still needed to be installed.
INSP-Sprinkler Rough-in/Hydro5/3/20065/3/20065/3/2006PCANC
DetailsTroy Cobbley
jim; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles wants to rescheduled for 5/4/2006
Plan resubmittals received  4/27/2006 DONE
Sprinkler Plan Check4/27/2006 4/27/2006 PASS
DetailsBill Alexander
Miscellaneous action  4/27/2006 DONE
Took Modified plans, documents to permit desk for releasing. No fee-2nd review.
Issue and Print Permit  4/24/2006 DONE
Plan assigned to (Bill)3/29/2006 4/21/2006 DONE
Sprinkler Plan Check3/29/2006 4/21/2006 PART
DetailsBill Alexander
Re-Submittals Of The Following Items Are Required:
1. When retroactive installation work and/or backflow prevention devices are to be installed on existing systems, a thorough hydraulic analysis, including revised hydraulic calculations, new fire flow data, and all necessary system modifications to accommodate the additional friction loss, shall be completed as a part of the installation on any existing system. (NFPA 13-8.16.4.6.2, 11.2.2.8.2, 14.1.3[30], BMC 7-01-50 IFC 901.2, IFC 105.4.2)

2. Backflow prevention shall be provided with required forward flow components/provisions in accordance with requirements addressed in NFPA 13-8.16.4.6.1*.

3. The working plan submittal shall include the manufacturer's installation instructions for any specially listed equipment, including descriptions, applications, and limitations for any (Sidewalls) sprinklers, devices, piping, or fittings. (NFPA 13-14.1.4)
PLANS/APPL TAKEN TO FRONT DESK  4/21/2006 DONE
Inspection Record Card- Fire4/21/2006 4/21/2006 DONE
Permit Ready to Issue  4/21/2006 DONE
Telephone call  4/21/2006 DONE
lt vm with greg patrick ###-#### that permit and fees are ready to be picked up
Miscellaneous action  4/19/2006 DONE
Approved Early Start requrest for installation of rough-in piping only, with my comment to refer to issued building plan review comments relative to sprinklers. Request states the existng system is to remain in service and will not be modified and no connection of new system piping to exisitng riser until plans have been approved and issued.
Application received  3/29/2006  
Case Summary  3/29/2006 DONE