INSP-Final Inspection | 8/24/2006 | 8/25/2006 | 8/25/2006 | A | PASS |
Forrest France
|
|
|
Fire alarm work is satisfactory, inspection passed. Sign at the door to FACP room to be posted today per agreement and verified at life safety final.
|
Issue and Print Permit | | | 5/30/2006 | | DONE |
|
|
|
|
Telephone call | | | 4/13/2006 | | DONE |
|
|
|
called futureteck to verify per mary f. not fees due
|
Plan assigned to (Mary) | 3/30/2006 | | 4/11/2006 | | DONE |
|
|
|
|
Alarm Plan Check | | | 4/11/2006 | | PASS |
|
|
|
Approved pending field inspection of fire alarm permit comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/11/2006 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 4/11/2006 | | 4/11/2006 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 4/11/2006 | | DONE |
|
|
|
|
Telephone call | | | 4/11/2006 | | DONE |
|
|
|
Spoke with Matt and told him permit is ready & fees for working without permit///4/11/06 @ 1:21pm BAS
|
Plan resubmittals received | | | 4/10/2006 | | DONE |
|
|
|
received application with plans put in fire box.
|
Alarm Plan Check | | | 4/7/2006 | | FAIL |
|
|
|
Resubmittal required. Sprinkler monitoring riser and FACP shown in incorrect locations on the plans. Second floor requires single/multi-station smoke detectors at three separate locations. No written comments. Greg @ Farren Engineering will bring new plans in Monday or Tuesday.
|
Application received | | | 3/30/2006 | | |
|
|
|
|
Case Summary | | | 3/30/2006 | | DONE |
|
|
|
|