Permit NumberFIR06-00248
StatusFinaled
Name FUTURETECH
Site Address 2444- 2450 N BOGUS BASIN RD
Project Namealm - HIGHLANDS VILLAGE BLD 13
Customer Number 
ePlanReview 
Description
To provide a required manual fire alarm system. The required manual fire alarm system includes sprinkler monitoring and notification throughout the public spaces. (Per IFC review, manual pull stations are not required if the building alarm system notifies on water flow).

The building permit BLD04-00944 is to construct a new 10,716 sq.ft. three story, four unit apartment building. The first floor is 3,806 sq.ft. which 2,000 sq.ft. is for the garages, the second floor is 3,946 sq.ft. and the third floor is 2,964 sq.ft. Three units are three bedroom and three and one half baths, one unit is four bedroom and three and one half baths. Note: This building is fire sprinklered per NFPA 13-R. All construction per the approved plans and attached comment list. MJP DRH 02-240 CUP 02-0141 2444 & 2448 n Bogus Basin Rd & 2446 & 2450 N Bogus Basin Rd (HARRISON FLOOR PLAN TYPE)
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection4/11/20064/11/20064/11/2006PPASS
DetailsForrest France
Fire alarm tested satisfactory, inspection passed.
Plan assigned to (Mary)4/3/2006 4/11/2006 DONE
Alarm Plan Check  4/11/2006 PASS
Approved pending field inspection of fire alarm permit comments.
PLANS/APPL TAKEN TO FRONT DESK  4/11/2006 DONE
Issue and Print Permit  4/11/2006 DONE
Plan resubmittals received  4/10/2006  
Alarm Plan Check  4/7/2006 FAIL
Resubmittal required. Sprinkler monitoring riser and FACP shown in incorrect locations on the plans. Second floor requires single/multi-station smoke detectors at three separate locations. No written comments. Greg @ Farren Engineering will bring new plans in Monday or Tuesday.
Telephone call  4/4/2006 DONE
telcon froom Steve Dresser, requesting expedited review if possible. He indicated the FA contractor (Future Tech) failed to submit plans for a FA permit and has already installed the system, knowingly violating the requirement for a permit prior to installation work. I indicated we would attempt to get it out by Friday, which would be a 5-day turnaround but I could not promise that.
Application received  4/3/2006  
Case Summary  4/3/2006 DONE
Miscellaneous action  4/3/2006 DONE
Forrest was at the site for a building life/safety inspection. The fire alarm system was fully installed without a permit. A double fee will be assessed.