INSP-Final Inspection | 9/25/2006 | 9/27/2006 | 9/27/2006 | A | PASS |
Forrest France
|
|
|
Fire sprinkler passed final inspection, permit finaled.
|
INSP-Final Inspection | 9/13/2006 | 9/14/2006 | 9/14/2006 | A | PART |
Forrest France
|
|
|
Main tie in to new addition is complete, overspacing at north entry has been corrected. Missing ceiling tile and escutcheons at several locations for completion of the remainder of remodeled rooms per scope of work.
|
INSP-Final Inspection | 8/18/2006 | 8/21/2006 | 8/21/2006 | A | NR |
Forrest France
|
|
|
Project is not ready for final inspection as requested, still need to adjust spacing at the north entry, main tie-in is not completed, will require ceiling tile and escutcheons in place prior to final.
|
INSP-Sprinkler Rough-in/Hydro | 8/8/2006 | 8/10/2006 | 8/11/2006 | P | PART |
Forrest France
|
|
|
OH rough-in at the new addition is acceptable for cover, noted one head at the north entry hallway is overspaced from the wall and will need relocated. AG hydro for the addition passed.
|
Issue and Print Permit | | | 5/11/2006 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 5/11/2006 | | 5/11/2006 | | DONE |
|
|
|
|
Plan assigned to (Bill) | 4/5/2006 | | 4/26/2006 | | DONE |
|
|
|
|
Sprinkler Plan Check | 4/5/2006 | | 4/26/2006 | | PASS |
Bill Alexander
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/26/2006 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 4/26/2006 | | 4/26/2006 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 4/26/2006 | | DONE |
|
|
|
|
Telephone call | | | 4/26/2006 | | DONE |
|
|
|
lft vm with rick reynolds ###-#### that permit and fees are ready to be picked up
|
Case Summary | | | 4/5/2006 | | DONE |
|
|
|
|
Application received | | | 4/5/2006 | | |
|
|
|
|