INSP-Final Inspection | 12/13/2010 | 12/16/2010 | 12/16/2010 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
Telephone call | | | 12/15/2010 | | DONE |
|
|
|
I left a message for Keith Cragun letting him know I found the record drawings and that there would be a fee for printing the 17 pages.
|
Telephone call | | | 12/15/2010 | | DONE |
|
|
|
I spoke with Art of ADT and let him know I located the record drawings and that he could come pick them up at any time. I informed him there would be a fee for printing the 17 sheets. He stated he understood.
|
Miscellaneous action | | | 12/14/2010 | | DONE |
|
|
|
Keith Cragun came in to request a copy of the city approved drawings. I let him know I would need to do some research, as this is a permit that is more than four years old we may not have it. I told him I would look in to it and call him back the next day.
|
INSP-Conference | 11/17/2010 | 11/23/2010 | 11/24/2010 | A | DONE |
Troy Cobbley
|
|
|
I followed up with Steve Bevans ###-####and he stated that he had just met with Dave Whiting, ADT, and that the project is moving forward. A follow up inspection is set up for next week.
|
FIR-Aging Inspection | 11/10/2010 | 11/10/2010 | 11/17/2010 | | NR |
Troy Cobbley
|
|
|
I spoke to Steve Bevans, chief operating officer, at this project site and went over needing to get the final inspection done. He will meet with others and contact me shortly. A follow up inspection has been scheduled for next week.
|
INSP-Conference | 7/7/2010 | 7/7/2010 | 7/7/2010 | P | DONE |
Troy Cobbley
|
|
|
I went over the outstanding issues as per the permit history with Keith at ADT.
|
INSP-Final Inspection | 8/8/2006 | 8/8/2006 | 8/8/2006 | P | FAIL |
Troy Cobbley
|
|
|
No test was performed since the sensors are not installed.
|
FIR-Aging Inspection | 8/7/2006 | 8/7/2006 | 8/8/2006 | | NR |
Troy Cobbley
|
|
|
Keith was following up on project
|
Issue and Print Permit | | | 4/19/2006 | | DONE |
|
|
|
|
Plan assigned to (Mary) | 4/6/2006 | | 4/17/2006 | | DONE |
|
|
|
|
Alarm Plan Check | | | 4/17/2006 | | PASS |
|
|
|
Approved pending PDS Fire Inspector field verification. No comments written.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/17/2006 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 4/17/2006 | | 4/17/2006 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 4/17/2006 | | DONE |
|
|
|
|
Telephone call | | | 4/17/2006 | | DONE |
|
|
|
tlk to dave whiting ###-#### that permit and fees are ready to be picked up
|
Case Summary | | | 4/6/2006 | | DONE |
|
|
|
|
Application received | | | 4/6/2006 | | |
|
|
|
|
INSP-Conference | 11/24/2010 | 12/1/2010 | | A | |
Troy Cobbley
|
|
|
Follow up inspection. Steve Bevans ###-####
|