INSP-Final Inspection | 12/29/2006 | 12/29/2006 | 12/29/2006 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Sprinkler Rough-in/Hydro | 10/19/2006 | 10/19/2006 | 10/19/2006 | P | PART |
Forrest France
|
|
|
UG fire supply line hydrostatic test passed. UG flush also completed satisfactory post hydro.
|
INSP-Sprinkler Rough-in/Hydro | 9/6/2006 | 9/6/2006 | 9/6/2006 | P | PASS |
Troy Cobbley
|
|
|
Underground supply piping is ok to bury but there is a potential problem with the bury depth as the piping follows the footings. It actually slope up to the stub-in. The top of pipe is 3'-2" from the top of the footing. I spoke to Brian about this. Final depth will be verifyied once final grade is complete.
|
FIR-Aging Inspection | 7/20/2006 | 7/20/2006 | 7/21/2006 | | NR |
Troy Cobbley
|
|
|
Per Greg the work is in progress.
|
Issue and Print Permit | | | 4/12/2006 | | DONE |
|
|
|
|
Plan assigned to (Bill) | 4/7/2006 | | 4/11/2006 | | DONE |
Bill Alexander
|
|
|
|
Sprinkler Plan Check | 4/7/2006 | | 4/11/2006 | | PASS |
Bill Alexander
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/11/2006 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 4/11/2006 | | 4/11/2006 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 4/11/2006 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 4/11/2006 | | 4/11/2006 | | DONE |
|
|
|
|
Application received | | | 4/7/2006 | | |
|
|
|
|