INSP-Final Inspection | 5/5/2006 | 5/8/2006 | 5/8/2006 | A | PASS |
Forrest France
|
|
|
Overhead fire sprinkler work is satisfactory, required corrections have been made, inspection passed.
|
INSP-Final Inspection | 5/4/2006 | 5/5/2006 | 5/7/2006 | P | FAIL |
Forrest France
|
|
|
The contractor has failed to request a rough-in inspection prior to ceiling cover. No inspection performed as the drop in tile must be removed to expose the installation for proper inspection. Noted shadowing at one location and missing drop ceiling at a closet with pendent sprinkler.
|
Issue permit | | | 5/4/2006 | | |
|
|
|
|
Plan assigned to (Bill) | 4/11/2006 | | 5/1/2006 | | DONE |
|
|
|
|
Sprinkler Plan Check | 4/11/2006 | | 5/1/2006 | | PASS |
Bill Alexander
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/1/2006 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 5/1/2006 | | |
|
|
|
|
Inspection Record Card- Fire | 5/1/2006 | | 5/1/2006 | | DONE |
|
|
|
|
Telephone call | | | 5/1/2006 | | DONE |
|
|
|
called ###-#### and left voicemail for Ron Larson that permit is ready and fee
|
Miscellaneous action | | | 4/17/2006 | | DONE |
|
|
|
Approved Early Start request by Viking, Ron Larson, to install 12 new pendent heads for this TI remodel. .
|
Application received | | | 4/11/2006 | | |
|
|
|
|