INSP-Final Inspection | 6/8/2006 | 6/8/2006 | 6/12/2006 | P | PASS |
Forrest France
|
|
|
Permit finaled.
|
INSP-Final Inspection | 6/9/2006 | 6/9/2006 | 6/9/2006 | P | PASS |
Forrest France
|
|
|
Fire sprinkler work passed field inspection, permit finaled.
|
Sprinkler Plan Check | 6/8/2006 | | 6/8/2006 | | PASS |
|
|
|
Plan modification, added two window heads.
|
Plan assigned to (Scott) | 6/7/2006 | | 6/8/2006 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/8/2006 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 6/8/2006 | | 6/8/2006 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 6/8/2006 | | DONE |
|
|
|
|
Telephone call | | | 6/8/2006 | | DONE |
|
|
|
tlk to brad bettencourt ###-#### that permit and no fees ready to be picked up
|
Issue and Print Permit | | | 6/8/2006 | | DONE |
|
|
|
|
INSP-Conference | 6/6/2006 | 6/7/2006 | 6/7/2006 | A | DONE |
Forrest France
|
|
|
On site visit to discuss fire sprinkler spacing issues.
|
Plan resubmittals received | | | 6/7/2006 | | DONE |
|
|
|
|
Plan assigned to (Mary) | 4/18/2006 | | 4/25/2006 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/25/2006 | | DONE |
|
|
|
|
Sprinkler Plan Check | 4/25/2006 | | 4/25/2006 | | PASS |
|
|
|
|
Telephone call | | | 4/25/2006 | | DONE |
|
|
|
lft ms with brad bettencourt ###-#### that permit and fees are ready to be picked up
|
Inspection Record Card- Fire | 4/25/2006 | | 4/25/2006 | | DONE |
|
|
|
|
Telephone call | | | 4/25/2006 | | DONE |
|
|
|
tlk to brad bettencourt ###-#### that permit and fees are ready to be picked up
|
Permit Ready to Issue | | | 4/25/2006 | | DONE |
|
|
|
|
Issue and Print Permit | | | 4/25/2006 | | DONE |
|
|
|
|
Application received | | | 4/18/2006 | | |
|
|
|
|