Information based on query as of Saturday, August 17, 2024.
Permit Information
Permit NumberFIR06-00321
StatusFinaled
Name DEBEST FIRE PROTECTION
Site Address 641 W MCGREGOR CT
Project NameSPR FEDERAL COM CNTR BLD #3
Customer Number 
ePlanReview 
Description
FEDERAL WAY COMMERCE CENTER - BUILDING #3 (SHELL) - This is a shell building permit only and no occupancy is allowed under this permit. Sprinklers are used for area increase. To install the underground supply and overhead system in a new 34,390-ft/2, high piled, one story, concrete tilt-up warehouse shell building. The underground consists of 186'+- of 6", C-900 PVC, connected at the property line off McGregor, running south, west then south under the footing and up through the floor into a fire sprinkler riser room (#100), with a 6" IBR riser, with a grooved flange. The overhead wet system is designed for protection of Class IV, nonencapsulated commodities, stored in single and double row, conventional pallet racks, to a maximum height of 16'-0" with a minimum 8'-0" aisles. (NFPA 13 Table 12.3.2.1.2, Figure 12.3.2.1.2(d), incorporating 12.3.2.1.5.1) All fire sprinkler system work shall comply with the IFC 2003, the attached review comments/conditions, as regulated by the Fire Chief. The review comments/conditions, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. This permit is attached to building permit: BLD05-03144.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Permit Ready to Issue  8/30/2006 DONE
Inspection Record Card- Fire8/30/2006 8/30/2006 DONE
Telephone call  8/30/2006 DONE
spoke to liz@###-####/told permit was ready, permit#, project name & address, and no fee
CHANGE STATUS TO (ISS)  8/30/2006 DONE
changed status no fee due
(F) Reprint permit  8/30/2006  
PLANS/APPL TAKEN TO FRONT DESK  8/29/2006 DONE
Second review - as-built plan mod. No fee.
Sprinkler Plan Check8/1/2006 8/25/2006 PASS
Resubmittal plan review by B. Johnson. Scope of Work: This plan review is the result of changes made in the field during construction. Hose stations were added in accordance with NFPA 13- sec.8.16.5. All other work was previously approved under the same permit #. The original plans and work have previously been accepted.
Under this permit plans were approved to construct a new 34,390 square foot, one story concrete tilt-up warehouse shell building and related site improvements. This is a shell building permit only and no occupancy is allowed under this permit. Separate tenant improvement permits will be required to finish this building for occupancy. This building is fully fire sprinklered; the sprinklers are used for area increase. This permit is attached to BLD05-03144
INSP-Final Inspection8/8/20068/10/20068/10/2006PPASS
DetailsForrest France
Fire sprinkler passed final inspection, permit finaled.
INSP-Final Inspection8/3/20068/7/20068/4/2006ACANC
DetailsForrest France
Contact: Todd - Final; Phone #: ###-#### Internet Inspection Request from: Alicia Pauley Inspection cancelled from web by: Alicia Pauley
INSP-Sprinkler Rough-in/Hydro8/3/20068/4/20068/4/2006APART
DetailsForrest France
Hydrostatic test of the OH sprinkler system and UG supply line passed inspection.
INSP-Sprinkler Rough-in/Hydro8/3/20068/3/20068/3/2006PDEFR
DetailsForrest France
Contact: Todd - Need UG & OH Hydro Test; Phone #: ###-#### Internet Inspection Request from: Alicia Pauley Inspection rescheduled
Plan resubmittals received  8/1/2006  
INSP-Supply line flush7/28/20067/31/20067/31/2006APART
DetailsForrest France
UG fire supply line flush completed satisfactory.
INSP-Sprinkler Rough-in/Hydro7/28/20067/31/20067/31/2006APART
DetailsForrest France
Noted required corrections from previous inspection have been completed, approved plans do not show a hose supply line which has been added to two 11/2 hose valves at center columns- approved plans to reflect these modifications.
INSP-Sprinkler Rough-in/Hydro7/27/20067/28/20067/28/2006ANR
DetailsForrest France
Items on previous correction notice are not yet completed for reinspection per phone conversation with contractor.
INSP-Sprinkler Rough-in/Hydro7/27/20067/27/20067/28/2006PFAIL
DetailsForrest France
Approved plans and review notes were not on site for inspection, noted some general items to the contractor which will need correction at the riser.
INSP-Sprinkler Rough-in/Hydro7/26/20067/27/20067/27/2006ADEFR
DetailsForrest France
Duplicate inspection request.
INSP-Sprinkler Rough-in/Hydro7/25/20067/26/20067/26/2006ADEFR
DetailsForrest France
Contact person not available, inspection rescheduled for 7/27.
INSP-Sprinkler Rough-in/Hydro6/19/20066/19/20066/20/2006PPART
DetailsForrest France
UG supply line is acceptable for cover.
INSP-Sprinkler Rough-in/Hydro6/16/20066/16/20066/19/2006PDEFR
DetailsForrest France
To be rescheduled due to time constraints.
INSP-Sprinkler Rough-in/Hydro6/14/20066/16/20066/15/2006ACANC
DetailsForrest France
Contact Dave UG Cover Inspection; Phone #: ###-#### Internet Inspection Request from: Alicia Pauley Inspection cancelled from web by: Alicia Pauley
Inspection Record Card- Fire5/12/2006 5/12/2006 DONE
Permit Ready to Issue  5/12/2006 DONE
Telephone call  5/12/2006 DONE
tlk to receptionist ###-#### that permit and fees are ready to be picked up
Issue and Print Permit  5/12/2006 DONE
Plan assigned to (Bill)5/1/2006 5/11/2006 DONE
Sprinkler Plan Check5/1/2006 5/11/2006 PASS
DetailsBill Alexander
PLANS/APPL TAKEN TO FRONT DESK  5/11/2006 DONE
Case Summary  5/11/2006 DONE
Application received  5/1/2006