INSP-Final Inspection | 7/19/2006 | 7/19/2006 | 7/20/2006 | P | PASS |
Forrest France
|
|
|
Fire sprinkler passed final inspection.
|
INSP-Sprinkler Rough-in/Hydro | 6/26/2006 | 6/27/2006 | 6/28/2006 | P | PART |
Forrest France
|
|
|
Overhead sprinkler rough-in is good for cover at the drop ceiling areas, final pending ceiling tile and escutcheons.
|
Application received | | | 5/4/2006 | | |
|
|
|
|
Sprinkler Plan Check | 5/4/2006 | | 5/4/2006 | | PASS |
|
|
|
Attached review comments to plans.
|
Plan assigned to (Scott) | 5/4/2006 | | 5/4/2006 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/4/2006 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 5/4/2006 | | 5/4/2006 | | DONE |
|
|
|
|
Telephone call | | | 5/4/2006 | | DONE |
|
|
|
tlk to brodie ###-#### that permit and fees are ready to be picked up
|
Permit Ready to Issue | | | 5/4/2006 | | DONE |
|
|
|
|
Issue and Print Permit | | | 5/4/2006 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 5/4/2006 | | | | |
|
|
|
|
Plan assigned to (Bill) | 5/4/2006 | | | | |
|
|
|
|