INSP-Final Inspection | 12/11/2006 | 12/11/2006 | 12/11/2006 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled. Underground flushed and alarms tested.
|
INSP-Final Inspection | 12/5/2006 | 12/6/2006 | 12/6/2006 | A | FAIL |
Troy Cobbley
|
|
|
The resubmitted plans were not on site. One pendant head is blocked by a light fixture. Underground flush and testing of the flow switch passed.
|
INSP-Sprinkler Rough-in | 7/10/2006 | 7/11/2006 | 7/11/2006 | P | PASS |
Troy Cobbley
|
|
|
Sprinkler piping is ok to cover but there are corrections that need to be done. See approved plans for locations. This will be verified at final.
|
CHANGE STATUS TO (ISS) | | | 7/6/2006 | | DONE |
|
|
|
plans picked up no fees
|
(F) Reprint permit | | | 7/6/2006 | | DONE |
|
|
|
|
Sprinkler Plan Check | 6/15/2006 | | 7/5/2006 | | PASS |
Bill Alexander
|
|
|
|
Miscellaneous action | | | 7/5/2006 | | DONE |
|
|
|
Took corrected plans to permit desk for releasing. 2nd revie, no fee.
|
Telephone call | | | 7/5/2006 | | DONE |
|
|
|
spoke to tim@###-####/told permit was ready with no fees
|
INSP-Sprinkler Rough-in | 6/19/2006 | 6/19/2006 | 6/19/2006 | P | FAIL |
Troy Cobbley
|
|
|
Per review notes the plans are to be resubmitted. No inspection performed.
|
Plan resubmittals received | | | 6/15/2006 | | |
|
|
|
|
Plan assigned to (Bill) | 5/5/2006 | | 5/12/2006 | | DONE |
Bill Alexander
|
|
|
|
Sprinkler Plan Check | 5/5/2006 | | 5/12/2006 | | PART |
Bill Alexander
|
|
|
The data has been moved to a Word document attached to this case.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/12/2006 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 5/12/2006 | | 5/12/2006 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 5/12/2006 | | DONE |
|
|
|
|
Issue and Print Permit | | | 5/12/2006 | | DONE |
|
|
|
|
Telephone call | | | 5/12/2006 | | DONE |
|
|
|
Spoke with Tim and told him that permit is ready for pick up @4:40pm on 5/12/06 BAS
|
Application received | | | 5/5/2006 | | |
|
|
|
|