INSP-Final Inspection | 10/30/2006 | 10/31/2006 | 10/31/2006 | A | PASS |
Forrest France
|
|
|
UG fire supply line permit finaled.
|
INSP-Supply line flush | 10/27/2006 | 10/30/2006 | 10/30/2006 | A | PASS |
Troy Cobbley
|
|
|
Undergroun flush passed.
|
INSP-Supply line flush | 10/26/2006 | 10/27/2006 | 10/27/2006 | A | FAIL |
Troy Cobbley
|
|
|
Waited for 1/2 an hour but united water did not show up
|
INSP-Sprinkler Rough-in | 10/24/2006 | 10/25/2006 | 10/25/2006 | A | PASS |
Troy Cobbley
|
|
|
Underground hydro test passed.
|
INSP-Supply line flush | 10/13/2006 | 10/16/2006 | 10/16/2006 | A | CANC |
Troy Cobbley
|
|
|
jim ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
|
INSP-Sprinkler Rough-in/Hydro | 10/13/2006 | 10/16/2006 | 10/16/2006 | A | CANC |
Troy Cobbley
|
|
|
jim ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
|
INSP-Supply line flush | 5/12/2006 | 5/12/2006 | 5/12/2006 | P | PASS |
Troy Cobbley
|
|
|
Inspection was for underground to cover not a flush. Underground is ok to cover. Tie in to the United Water supply still needs to be done.
|
Plan assigned to (Bill) | 5/5/2006 | | 5/9/2006 | | DONE |
|
|
|
|
Sprinkler Plan Check | 5/5/2006 | | 5/9/2006 | | PASS |
Bill Alexander
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/9/2006 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 5/9/2006 | | 5/9/2006 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 5/9/2006 | | DONE |
|
|
|
|
Telephone call | | | 5/9/2006 | | |
|
|
|
lft vm with brad bettenourt ###-#### that permit and fees are ready to be picked up
|
Issue and Print Permit | | | 5/9/2006 | | DONE |
|
|
|
|
Application received | | | 5/5/2006 | | |
|
|
|
|