Permit Information
Permit NumberFIR06-00348
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 739 E PARKCENTER BLVD
Project NameSPR ALTERRA WYNWOOD REPAIRS
Customer Number 
ePlanReview 
Description
ALTERRA WYNWOOD AT RIVER PLACE * To replace an existing 4" DPV pipe valve with a new Reliable Model "D" DPV. Also to remove all existing dry pipe system mains due to the deterioration and rotting which has created dry systems leaks, and replace with new re-graded galvanized mains on a two story nursing home for ambulatory patients. The buildings have a total area of 60,400-ft/2, with 34,400-ft/2 on the 1st floor and 26,000-ft/2 on the 2nd floor. The existing system exceed 750 gallons and will required reverification of meeting requirements of NFPA 13-7.2.3*. This building is fully fire sprinklered. The fire sprinkler system work shall comply with IFC 2003, attached review comment and conditions list, as regulated by the Fire Chief. These notes, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. This permit is not attached to any associated building permit.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection10/2/200610/3/200610/3/2006PPASS
DetailsForrest France
Fire sprinkler final testing passed field inspection, permit finaled.
INSP-Sprinkler Rough-in8/15/20068/16/20068/16/2006APART
DetailsForrest France
OH inspection related to the permitted work is satisfactory. Final pending trip testing meeting requirements of NFPA 13 7.2.3.
INSP-Sprinkler Rough-in/Hydro8/14/20068/15/20068/15/2006PPART
DetailsForrest France
Hydrostatic test of the dry system installation passed, rough-in inspection not completed at this time.
Issue and Print Permit  5/17/2006 DONE
Inspection Record Card- Fire5/16/2006 5/16/2006 DONE
Permit Ready to Issue  5/16/2006 DONE
Telephone call  5/16/2006 DONE
tlk to jeff anderson ###-#### that permit and fees are ready to be picked up
Sprinkler Plan Check5/9/2006 5/15/2006 PASS
DetailsBill Alexander
PLANS/APPL TAKEN TO FRONT DESK  5/15/2006 DONE
Case Summary  5/15/2006 DONE
Plan assigned to (Bill)5/9/2006 5/15/2006 DONE
Miscellaneous action  5/15/2006 DONE
Holding plans for 24 hours to see if plan review comments of some basic issues (emailed 5/15/06 - 3:15 PM), can be addressed/answered prior to failing. Comments are attached to "plan review" notes.
Application received  5/9/2006  
Case Summary  5/9/2006 DONE
Plan resubmittals received  5/9/2006  
Major plan modifications.
Sprinkler Plan Check5/15/2006    
DetailsBill Alexander
5/15/2006 - Current re-submittal problems.
In the resubmittal site plan, the pipe from the street to the meter is not sized or typed?
2. The calcs do not include this pipe. Can you explain why?
3. Why does the 2nd floor perform better than the 1st floor, when the piping is all the same and it is 18'-0" higher from "F"? I could not see any pressure elevation losses for either after getting into the house at "FF"? In fact, I see none for the 2nd remote test, from the tap in the street, (which means the "Sprinkler Head Analysis" reports are incorrect and/or do not correlate with the calculations provided)?
4. The plan lacks the size of the meter (which is 1" in the calcs). This information should be on the plans since they both should correlate for easy plan review and (Inspector) site verification. (I will manually correct this information on the 5 sets provided this once).
5. On the riser, do you have a control valve upstream of the domestic and fire sprinkler take-off identified (which is required)? If on is provided, locate it and include in the calculations.
6. NFPA 13D references calculation procedures incorporated in NFPA 13 which includes addressing the friction loss of the 1-1/4" flow switch. Please include that switch in the calculations as required in NFPA 13-14.4.4.5[1].