Case Summary | | | 3/3/2008 | | DONE |
|
|
|
|
(F) Reprint permit | | | 3/3/2008 | | DONE |
|
|
|
|
INSP-Final Inspection | 6/5/2006 | 6/5/2006 | 6/5/2006 | P | PASS |
Forrest France
|
|
|
Required correction verified, fire sprinkler permit finaled.
|
Override - Parcel Holds | 1/1/1900 | 1/1/1900 | 6/5/2006 | | |
|
|
|
ok
|
INSP-Sprinkler Rough-in | 5/25/2006 | 5/26/2006 | 5/26/2006 | A | PASS |
Forrest France
|
|
|
steve - cover insp; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
OK to cover. Prior to final, check for 2" main and line pipe heat tape and wrap removal.
|
Override - Parcel Holds | 1/1/1900 | 1/1/1900 | 5/25/2006 | | |
|
|
|
not a final - just cover inspection
|
Override - Parcel Holds | | | 5/16/2006 | | |
|
|
|
|
Issue and Print Permit | | | 5/16/2006 | | DONE |
|
|
|
|
Plan assigned to (Bill) | 5/12/2006 | | 5/15/2006 | | DONE |
|
|
|
|
Sprinkler Plan Check | 5/12/2006 | | 5/15/2006 | | PASS |
Bill Alexander
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/15/2006 | | DONE |
|
|
|
|
Case Summary | | | 5/15/2006 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 5/15/2006 | | |
|
|
|
|
Permit Ready to Issue | | | 5/15/2006 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 5/15/2006 | | |
|
|
|
|
Inspection Record Card- Fire | 5/15/2006 | | 5/15/2006 | | DONE |
|
|
|
|
Telephone call | | | 5/15/2006 | | DONE |
|
|
|
Left a voice messafge for Mathew and told him that permit is ready & fees///5/15/06 @ 12:05 pm BAS
|
Application received | | | 5/12/2006 | | |
|
|
|
|