INSP-Final Inspection | 6/2/2010 | 6/2/2010 | 6/2/2010 | P | PASS |
Forrest France
|
|
|
Permit okay for final status.
|
FIR-Aging Inspection | 6/1/2010 | 6/1/2010 | 6/2/2010 | | DONE |
Forrest France
|
|
|
Scheduled for final.
|
Miscellaneous action | | | 3/11/2010 | | DONE |
|
|
|
Sent email requesting project status.
|
INSP-Conference | 5/20/2009 | 5/21/2009 | 5/21/2009 | A | DONE |
Troy Cobbley
|
|
|
I spoke to Adam and told him that an inspector would need to witness that the signals had been corrected and then the permit could be finaled.
|
INSP-Final Inspection | 7/18/2007 | 7/18/2007 | 7/18/2007 | P | FAIL |
Troy Cobbley
|
|
|
The flow switch reported correctly to the remote annunciator and to central station but the tamper and low air reported as general trouble signals. They need to be supervisory. The trip test of the valve passed.
|
FIR-Aging Inspection | 2/20/2007 | 2/20/2007 | 2/27/2007 | | DONE |
Forrest France
|
|
|
Contractor to schedule inspection.
|
Plan assigned to (Bill) | 5/12/2006 | | 5/15/2006 | | DONE |
|
|
|
|
Sprinkler Plan Check | 5/12/2006 | | 5/15/2006 | | PASS |
Bill Alexander
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/15/2006 | | DONE |
|
|
|
|
Case Summary | | | 5/15/2006 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 5/15/2006 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 5/15/2006 | | 5/15/2006 | | DONE |
|
|
|
|
Telephone call | | | 5/15/2006 | | DONE |
|
|
|
Spoke with Jeff Anderson and told him that permit is ready & fees///5/15/06 @ 12:10 pm BAS
|
Issue and Print Permit | | | 5/15/2006 | | DONE |
|
|
|
|
Application received | | | 5/12/2006 | | |
|
|
|
|