INSP-Final Inspection | 11/29/2007 | 11/30/2007 | 11/30/2007 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled. The slave dialer has the required 24 hour battery backup.
|
Inspection Record Card- Fire | 11/21/2007 | | 11/21/2007 | | DONE |
|
|
|
|
Telephone call | | | 11/21/2007 | | DONE |
|
|
|
tlk to charlie ###-#### that permit is ready to be picked up and no fee
|
Permit Ready to Issue | | | 11/21/2007 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 11/21/2007 | | |
|
|
|
not fees due
|
Alarm Plan Check | 11/21/2007 | | 11/21/2007 | | PASS |
|
|
|
Fire Alarm Review 3rd
|
Alarm Plan Check | 11/21/2007 | | 11/21/2007 | | PASS |
|
|
|
Fire Alarm Review 2nd
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/21/2007 | | |
|
|
|
Ready for Re-Issue
|
Plan resubmittals received | | | 11/19/2007 | | |
|
|
|
received "2" sets of plans & fire alarm permit app (2) pages--put plans on fire shelf
|
Plan assigned to (Mike) | 11/19/2007 | | 11/19/2007 | | |
|
|
|
Re-Issued to Mike Timmerman
|
INSP-Final Inspection | 11/7/2007 | 11/14/2007 | 11/14/2007 | A | FAIL |
Troy Cobbley
|
|
|
As per the previous correction notice plans need to be resubimitted showing the dact connected to the facp, fix the trouble signal on the facp, adjust and retest the tamper switches, provide updated map at the facp
|
INSP-Final Inspection | 6/21/2007 | 6/26/2007 | 6/26/2007 | A | FAIL |
Troy Cobbley
|
|
|
The only item that tested ok was the duct smoke detector in the Lucent tenant space. The plans need to be resubmitted showing the slave radionics dialer that has been connected to the Simplex 4005 panel. The dialer is not sending out phone line troubles or loss of battery. It did however send out the duct detector supervisory and the loss of ac power. A building map needs to be provided and the power supply for the dialer needs to be mechanically secured. No other duct detectors were tested or any of the sprinkler devices. Test has been stopped and failed.
|
FIR-Aging Inspection | 9/8/2006 | 9/8/2006 | 9/15/2006 | | NR |
Troy Cobbley
|
|
|
Per Charlie the work is complete, they are just waiting to get the st. als project completed first
|
Plan assigned to (Mary) | 5/15/2006 | | 5/31/2006 | | DONE |
|
|
|
|
Alarm Plan Check | | | 5/31/2006 | | PASS |
|
|
|
Approved pending field inspection of fire alarm permit comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/31/2006 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 5/31/2006 | | 5/31/2006 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 5/31/2006 | | DONE |
|
|
|
|
Telephone call | | | 5/31/2006 | | DONE |
|
|
|
lft ms with receptionist for charlie bayne ###-#### that permit and fees are ready to be picked up
|
Issue and Print Permit | | | 5/31/2006 | | DONE |
|
|
|
|
Telephone call | | | 5/19/2006 | | DONE |
|
|
|
Left a message for Charlie that the plans do NOT match the riser.
|
Application received | | | 5/15/2006 | | |
|
|
|
|
Case Summary | | | 5/15/2006 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 11/21/2007 | | | | |
|
|
|
|