INSP-Final Inspection | 6/6/2006 | 6/7/2006 | 6/7/2006 | A | PASS |
Forrest France
|
|
|
Fire sprinkler work passed final inspection.
|
INSP-Final Inspection | 6/5/2006 | 6/5/2006 | 6/5/2006 | P | FAIL |
Forrest France
|
|
|
Missing ceiling tile and escutcheons at the new heads along the west wall.
|
INSP-Final Inspection | 5/19/2006 | 5/22/2006 | 5/22/2006 | A | PART |
Forrest France
|
|
|
Final pending ceiling tile and escutcheons at pendent heads in the drop ceiling areas.
|
INSP-Sprinkler Rough-in | 5/19/2006 | 5/22/2006 | 5/22/2006 | A | PART |
Forrest France
|
|
|
Overhead fire sprinkler work is satisfactory, final pending escutcheons and installation of ceiling tile.
|
Issue and Print Permit | | | 5/19/2006 | | DONE |
|
|
|
|
Issue and Print Permit | | | 5/19/2006 | | DONE |
|
|
|
|
Plan assigned to (Bill) | 5/16/2006 | | 5/17/2006 | | DONE |
|
|
|
|
Sprinkler Plan Check | 5/16/2006 | | 5/17/2006 | | PASS |
Bill Alexander
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/17/2006 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 5/17/2006 | | 5/17/2006 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 5/17/2006 | | DONE |
|
|
|
|
Application received | | | 5/16/2006 | | |
|
|
|
|