INSP-Final Inspection | 2/26/2007 | 2/27/2007 | 2/27/2007 | A | PASS |
Forrest France
|
|
|
On site visit to verify clear panel. TI fire alarm permit finaled.
|
INSP-Final Inspection | 7/21/2006 | 7/24/2006 | 7/24/2006 | A | FAIL |
Troy Cobbley
|
|
|
Ok to final when the 9th floor trouble on the facp has been fixed.
|
INSP-Final Inspection | 7/18/2006 | 7/21/2006 | 7/22/2006 | P | CANC |
Forrest France
|
|
|
Inspection canceled per phone conversation with contractor.
|
Inspection Record Card- Fire | 5/26/2006 | | 5/26/2006 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 5/26/2006 | | DONE |
|
|
|
|
Telephone call | | | 5/26/2006 | | DONE |
|
|
|
lft vm for rob ahten ###-#### that permit and fees are ready to be picked up
|
Issue and Print Permit | | | 5/26/2006 | | DONE |
|
|
|
|
Alarm Plan Check | | | 5/25/2006 | | PASS |
|
|
|
Approved pending field inspection of fire alarm permit comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/25/2006 | | DONE |
|
|
|
|
Telephone call | | | 5/24/2006 | | DONE |
|
|
|
Requested speaker wattage calculations.
|
Plan resubmittals received | | | 5/24/2006 | | DONE |
|
|
|
Received e-mail from Rob Ahten containing the speaker wattage calculations.
|
Case Summary | | | 5/22/2006 | | |
|
|
|
|
Application received | | | 5/22/2006 | | |
|
|
|
|
Plan assigned to (Mary) | 5/22/2006 | | | | |
|
|
|
|