INSP-Final Inspection | 7/19/2006 | 7/19/2006 | 7/19/2006 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled. Sprinkler work shown for the new office located at the rear of the store was not needed since the office was not built.
|
INSP-Final Inspection | 6/22/2006 | 6/23/2006 | 6/23/2006 | A | CANC |
Troy Cobbley
|
|
|
Scheduled by a contractor via Hello! on 6/22/2006 at 2:19:03 PM. Contact: ###-####.
|
INSP-Sprinkler Rough-in/Hydro | 6/22/2006 | 6/23/2006 | 6/23/2006 | A | PASS |
Troy Cobbley
|
|
|
pharmacy piping is ok to cover
|
INSP-Sprinkler Rough-in/Hydro | 6/1/2006 | 6/2/2006 | 6/2/2006 | A | PART |
Troy Cobbley
|
|
|
Inspection was for the Vision Center piping only. Need to separate supplies to the drops from the common supply in the right rear office and provide a retaining strap for the pendant in the left rear corner of the vision center. Sprinkler piping is ok to cover. The correction listed above will be verified at the final.
|
Issue and Print Permit | | | 5/31/2006 | | DONE |
|
|
|
|
Plan assigned to (Bill) | 5/23/2006 | | 5/26/2006 | | DONE |
Bill Alexander
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/26/2006 | | DONE |
|
|
|
|
Sprinkler Plan Check | 5/23/2006 | | 5/26/2006 | | PASS |
Bill Alexander
|
|
|
|
Inspection Record Card- Fire | 5/26/2006 | | 5/26/2006 | | DONE |
|
|
|
|
Telephone call | | | 5/26/2006 | | DONE |
|
|
|
tlk to tom easton ###-#### that permit and fees are ready to be picked up
|
Permit Ready to Issue | | | 5/26/2006 | | DONE |
|
|
|
|
Miscellaneous action | | | 5/25/2006 | | DONE |
|
|
|
Approved Early Start request "to relocate pendent heads for tenanat remodel in various areas of the building". Approved only for this scope of work.
|
Application received | | | 5/23/2006 | | |
|
|
|
|