INSP-Final Inspection | 3/9/2007 | 3/9/2007 | 3/12/2007 | P | PASS |
Forrest France
|
|
|
Final sprinkler inspection passed, noted missing ceiling tile at one location in front of the womens restroom to be installed today per Sam of Unico.
|
INSP-Sprinkler Rough-in | 8/8/2006 | 8/8/2006 | 8/8/2006 | P | PART |
Forrest France
|
|
|
OH rough-in is good for cover, final pending ceiling tile and escutcheons.
|
INSP-Sprinkler Rough-in | 6/16/2006 | 6/19/2006 | 6/19/2006 | A | PART |
Forrest France
|
|
|
Heads in the elevator lobby vaulted hard lid ceiling area are okay to cover.
|
Issue and Print Permit | | | 5/31/2006 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 5/30/2006 | | 5/30/2006 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 5/30/2006 | | DONE |
|
|
|
|
Telephone call | | | 5/30/2006 | | DONE |
|
|
|
Left voice message for Brad and told him that permit is ready & fees///5/30/06 @ 10:19 am BAS
|
Application received | | | 5/26/2006 | | |
|
|
|
|
Plan assigned to (Bill) | 5/26/2006 | | 5/26/2006 | | DONE |
|
|
|
|
Sprinkler Plan Check | 5/26/2006 | | 5/26/2006 | | PASS |
Bill Alexander
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/26/2006 | | DONE |
|
|
|
|