(F) Reprint permit | | | 2/1/2007 | | DONE |
|
|
|
|
(F) Reprint permit | | | 2/1/2007 | | |
|
|
|
|
INSP-Final Inspection | 8/15/2006 | 8/16/2006 | 8/16/2006 | A | PASS |
Forrest France
|
|
|
Required corrections have been made, fire sprinkler permit finaled.
|
INSP-Sprinkler Rough-in/Hydro | 7/24/2006 | 7/25/2006 | 7/25/2006 | A | PART |
Forrest France
|
|
|
Overhead rough-in is acceptable for cover at the drop ceiling areas, noted DP in the cooler is not installed at this time. Also noted 200 degree heads are installed throughout the entire TI space where only ordinary temp. heads are required per NFPA 13 8.3.2.
|
Plan assigned to (Scott) | 6/2/2006 | | 6/8/2006 | | DONE |
|
|
|
|
Sprinkler Plan Check | 6/2/2006 | | 6/8/2006 | | PASS |
|
|
|
Attached review comments to plans.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/8/2006 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 6/8/2006 | | 6/8/2006 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 6/8/2006 | | DONE |
|
|
|
|
Telephone call | | | 6/8/2006 | | DONE |
|
|
|
lft ms with vm ###-#### for don demichele that permit and fees are ready to be picked up
|
Issue and Print Permit | | | 6/8/2006 | | DONE |
|
|
|
|
Application received | | | 6/1/2006 | | |
|
|
|
|
Plan assigned to (Bill) | 6/1/2006 | | | | |
|
|
|
|