INSP-Final Inspection | 9/20/2006 | 9/20/2006 | 9/20/2006 | P | PASS |
Forrest France
|
|
|
Fire sprinkler permitted work is complete, final inspection passed.
|
INSP-Sprinkler Rough-in/Hydro | 8/22/2006 | 8/23/2006 | 8/23/2006 | A | PART |
Forrest France
|
|
|
OH inspection for the 1st floor rough-in is satisfactory.
|
INSP-Sprinkler Rough-in/Hydro | 8/14/2006 | 8/15/2006 | 8/15/2006 | P | PART |
Forrest France
|
|
|
OH rough-in at the drop ceiling areas is okay to cover, the telephone room will require a drop ceiling and pendent sprinkler or walls must extend to the deck for upright protection.
|
Telephone call | | | 8/14/2006 | | DONE |
|
|
|
Approved use of intermediate temp heads for light hazard areas as shown on the issued approved plans, on exception basis, for this situation only. S.Rogers
|
Issue and Print Permit | | | 8/1/2006 | | DONE |
|
|
|
|
Plan assigned to (Bill) | 6/5/2006 | | 7/27/2006 | | DONE |
|
|
|
|
Sprinkler Plan Check | 7/18/2006 | | 7/27/2006 | | PASS |
Bill Alexander
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/27/2006 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 7/27/2006 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 7/27/2006 | | 7/27/2006 | | DONE |
|
|
|
|
Telephone call | | | 7/27/2006 | | DONE |
|
|
|
spoke to liz@###-####/told permit was ready, permit#, address, project name, and fee
|
Plan resubmittals received | | | 7/18/2006 | | |
|
|
|
|
Telephone call | | | 6/20/2006 | | DONE |
|
|
|
lft vm with Randy bowron ###-#### that the bld permit is still in review and unable to issue the fire permit return to sender
|
Miscellaneous action | | | 6/20/2006 | | DONE |
|
|
|
Returned plans due to BLD not finaled and possible modification pending.
|
Application received | | | 6/5/2006 | | |
|
|
|
|