INSP-Final Inspection | 12/20/2006 | 12/21/2006 | 12/21/2006 | P | PASS |
Forrest France
|
|
|
Final fire sprinkler inspection passed, permit finaled.
|
INSP-Final Inspection | 12/19/2006 | 12/20/2006 | 12/21/2006 | P | NR |
Forrest France
|
|
|
Project is not completed for final inspection at this time.
|
INSP-Sprinkler Rough-in | 8/15/2006 | 8/15/2006 | 8/15/2006 | A | DONE |
Forrest France
|
|
|
Duplicate inspection request.
|
INSP-Sprinkler Rough-in | 8/15/2006 | 8/15/2006 | 8/15/2006 | A | PART |
Forrest France
|
|
|
The remainder of OH rough-in at the hard lid areas is good for cover.
|
INSP-Sprinkler Rough-in/Hydro | 7/17/2006 | 7/18/2006 | 7/18/2006 | P | PART |
Forrest France
|
|
|
OH rough-in is acceptable for cover at the areas as marked on approved plans, heads at stairs, and two locations 5th floor are not installed at this time.
|
Issue and Print Permit | | | 6/14/2006 | | |
|
|
|
|
Inspection Record Card- Fire | 6/13/2006 | | 6/13/2006 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 6/13/2006 | | DONE |
|
|
|
|
Telephone call | | | 6/13/2006 | | DONE |
|
|
|
tlk to jim danes ###-#### that permit and fees are ready to be picked up
|
Plan assigned to (Scott) | 6/12/2006 | | 6/12/2006 | | DONE |
|
|
|
|
Sprinkler Plan Check | 6/12/2006 | | 6/12/2006 | | DONE |
|
|
|
Attached review comments to plans.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/12/2006 | | DONE |
|
|
|
|
Application received | | | 6/5/2006 | | |
|
|
|
|
Case Summary | | | 6/5/2006 | | |
|
|
|
|
Plan assigned to (Bill) | 6/5/2006 | | | | |
|
|
|
|