Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberFIR06-00422
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 121 N 9TH ST Unit: 401
Project NameSPR PLAZA 121-SUITE 401
Customer Number 
ePlanReview 
Description
PLAZA 121-SUITE 401 - VANILLA FINISH/FOURTH FLOOR - To install 24 SSP Q.R. sprinklers for the remodel of a 2009-ft/2 portion of the fourth floor for a future office tenant. This is a shell permit and separate permit may be required for tenant occupancy. The fire sprinkler work is related to the construction of interior noncombustible partitions to create to create reception area, office areas & common conference room area with Suite #402, installation of suspended ceiling system. This fire protection work shall comply with the IFC 2003 and the permit review comments; each regulated by the Fire Chief. The review comments, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. This permit is attached to BLD06-01581.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection11/13/200611/13/200611/13/2006PPASS
DetailsForrest France
Fire sprinkler permit finaled.
INSP-Final Inspection10/24/200610/25/200610/25/2006APART
DetailsForrest France
Okay to cover OH rough-in at the drop ceiling areas.
Plan assigned to (Bill)6/5/2006 7/26/2006 DONE
Sprinkler Plan Check7/17/2006 7/26/2006 PASS
DetailsBill Alexander
PLANS/APPL TAKEN TO FRONT DESK  7/26/2006 DONE
Override - Parcel Holds  7/26/2006  
Permit Ready to Issue  7/26/2006 DONE
Override - Parcel Holds  7/26/2006  
Inspection Record Card- Fire7/26/2006 7/26/2006 DONE
Telephone call  7/26/2006 DONE
spoke to gereald@###-####/told permit was ready, permit#, address, and fee
Override - Parcel Holds  7/26/2006  
Override - Parcel Holds  7/26/2006  
Issue and Print Permit  7/26/2006  
Plan resubmittals received  7/17/2006 DONE
received plan resubmittals for suite 401 plaza 121 (4TH ) floor
Miscellaneous action  6/20/2006 DONE
Returned plans due to BLD not finaled and possible modification pending.
Telephone call  6/20/2006 DONE
left vm with gerald ebeling @###-#### that bdlg is not finished & needs to be picked up
Application received  6/5/2006