StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 2223 W AIRPORT WAY
Project NameSPR AIRPORT BUSINESS CENTER B
Customer Number 
ePlanReview 
Description
Airport Business Center - Building #B (Shell Only) - To install a complete Light Hazard Occupancy System in a new 10,000-ft/2, one story, concrete tilt-up office shell building. This is a shell building only and no occupancy is allowed under this permit. Separate tenant improvement permits will be required to finish this building for occupancy. The fire sprinkler system work shall comply with the IFC 2003, the attached review comments/conditions, as regulated by the Fire Chief. The review comments/conditions, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. The underground fire service was installed under FIR06-00238. This permit is attached to building permit: BLD05-001992.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection3/24/20083/24/20083/24/2008PPASS
DetailsForrest France
Shell fire sprinkler permit finaled.
FIR-Aging Inspection3/20/20083/20/20083/24/2008PDONE
DetailsForrest France
Ready for final.
FIR-Aging Inspection1/29/20071/30/20071/30/2007ADONE
DetailsForrest France
Final pending satisfactory alarm supervision testing.
INSP-Sprinkler Rough-in9/26/20069/27/20069/27/2006APART
DetailsForrest France
OH rough-in is acceptable pending spacing at NE and SE overbuilds and revision of the ball drip location on the FDC for proper functionality.
INSP-Supply line flush8/2/20068/3/20068/3/2006APART
DetailsForrest France
UG supply line flush performed satisfactory.
Plan assigned to (Bill)6/7/2006 6/21/2006 DONE
Sprinkler Plan Check6/7/2006 6/21/2006 PASS
DetailsBill Alexander
PLANS/APPL TAKEN TO FRONT DESK  6/21/2006 DONE
Inspection Record Card- Fire6/21/2006 6/21/2006 DONE
Permit Ready to Issue  6/21/2006 DONE
Telephone call  6/21/2006 DONE
spoke to greg johnson @###-#### - told him the permit was ready and the fee associated with it.
Issue and Print Permit  6/21/2006 DONE
Application received  6/7/2006