INSP-Final Inspection | 11/6/2006 | 11/6/2006 | 11/6/2006 | P | PASS |
Forrest France
|
|
|
Fire sprinkler permit finaled.
|
INSP-Sprinkler Rough-in/Hydro | 10/18/2006 | 10/18/2006 | 10/19/2006 | P | PART |
Forrest France
|
|
|
AG hydrostatic test for the antifreeze system, wet system, and FDC piping passed. Noted one missing head at the lower stair landing.
|
INSP-Sprinkler Rough-in/Hydro | 7/11/2006 | 7/12/2006 | 7/12/2006 | A | PASS |
Troy Cobbley
|
|
|
Underground hydro test passed
|
Inspection Record Card- Fire | 6/27/2006 | | 6/27/2006 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 6/27/2006 | | DONE |
|
|
|
|
Telephone call | | | 6/27/2006 | | DONE |
|
|
|
tlk to commercial ###-#### that permit and fees are ready to be picked up
|
Issue permit | | | 6/27/2006 | | |
|
|
|
|
Plan assigned to (Bill) | 6/8/2006 | | 6/26/2006 | | DONE |
|
|
|
|
Sprinkler Plan Check | 6/8/2006 | | 6/26/2006 | | PASS |
Bill Alexander
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/26/2006 | | DONE |
|
|
|
|
Case Summary | | | 6/8/2006 | | DONE |
|
|
|
|
Application received | | | 6/8/2006 | | |
|
|
|
|