INSP-Final Inspection | 4/28/2009 | 4/29/2009 | 4/30/2009 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
DOC - Permit Finaled | 4/27/2009 | 4/27/2009 | 4/28/2009 | P | PASS |
Troy Cobbley
|
|
|
|
INSP-Sprinkler Rough-in/Hydro | 4/21/2009 | 4/22/2009 | 4/22/2009 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Final Inspection | 4/20/2009 | 4/21/2009 | 4/21/2009 | A | CANC |
Troy Cobbley
|
|
|
The inspection has been rescheduled for tomorrow due to time constraints today.
|
(F) Reprint permit | | | 4/20/2009 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 4/20/2009 | | DONE |
|
|
|
|
Plan assigned to (Tim) | 4/13/2009 | | 4/17/2009 | | DONE |
Tim Frost
|
|
|
4/17/2009 15:26:34 TRF - activity updated through activity FIRA22 from case FIR06-00469.
|
Sprinkler Plan Check | 4/17/2009 | | 4/17/2009 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/17/2009 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 4/17/2009 | | DONE |
Alexandra L. DeYoung
|
|
|
|
Telephone call | | | 4/17/2009 | | DONE |
Alexandra L. DeYoung
|
|
|
LM for Tim- permit ready- fees given
|
Plan resubmittals received | | | 4/13/2009 | | |
Tisha Gallop
|
|
|
received application, submittal info and plan sheets FP-01, FP-02; taken to fire review
|
INSP-Final Inspection | 3/30/2009 | 3/31/2009 | 3/31/2009 | A | FAIL |
Troy Cobbley
|
|
|
There are three pendant heads blocked by obstructions. One is by a hanging light in the first floor north dining area. THe other two are too close to ceiling fans in the second floor bedrooms. Also the wrong sized water meeter was not addressed with the last resubmittals and does need to be addressed with resubmittals. The water meter currently installed is 1" in size. I spoke to Mick about these items.
|
Issue and Print Permit | | | 9/5/2006 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 9/5/2006 | | 9/5/2006 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/25/2006 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 8/25/2006 | | DONE |
|
|
|
|
Telephone call | | | 8/25/2006 | | DONE |
|
|
|
left vm for tim@###-####/told permit was ready, project name, and no fee
|
Sprinkler Plan Check | | | 8/23/2006 | | PASS |
|
|
|
Plans approved by B. Johnson.
|
Plan resubmittals received | | | 8/11/2006 | | |
|
|
|
Received resubmittals /as built sent to fire. This was a duplicate of the resubmittal received yesterday. Do not process.
|
Plan resubmittals received | | | 8/10/2006 | | |
|
|
|
|
INSP-Sprinkler Rough-in | 8/7/2006 | 8/8/2006 | 8/8/2006 | A | PASS |
Troy Cobbley
|
|
|
Sprinkler piping is ok to cover. As-builts need to be submitted prior to building final showing the piping changes on the first floor due to the beam and the added head in the restroom
|
INSP-Sprinkler Rough-in | 8/4/2006 | 8/7/2006 | 8/7/2006 | A | FAIL |
Troy Cobbley
|
|
|
Sprinkler piping does not match the plans and needs resubmitting. A sticker to "Do not cover pipe" was posted. Also the water meter is not sized per the plans and there is no way for me to verify that the piping between the city connection and the water meter is 1 1/2".
|
Permit Ready to Issue | | | 7/18/2006 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 7/18/2006 | | 7/18/2006 | | DONE |
|
|
|
|
Telephone call | | | 7/18/2006 | | DONE |
|
|
|
spoke to tim@###-####/told permit was ready, permit#, address, project name, and fee
|
Issue and Print Permit | | | 7/18/2006 | | DONE |
|
|
|
|
Plan assigned to (Bill) | 6/22/2006 | | 7/17/2006 | | PASS |
Bill Alexander
|
|
|
|
Sprinkler Plan Check | 6/22/2006 | | 7/17/2006 | | DONE |
Bill Alexander
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/17/2006 | | DONE |
|
|
|
|
Application received | | | 6/22/2006 | | |
|
|
|
|