INSP-Final Inspection | 10/30/2007 | 10/30/2007 | 10/30/2007 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Sprinkler Rough-in/Hydro | 10/30/2007 | 10/30/2007 | 10/30/2007 | P | CANC |
Troy Cobbley
|
|
|
please call russ to confirm time Phone #: ###-#### Internet Inspection Request from: Jeff Packham Inspection cancelled from web by: Jeff Packham
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/3/2007 | | |
|
|
|
|
Telephone call | | | 10/3/2007 | | DONE |
|
|
|
tlk to jeff packham that permit is ready to be picked up
|
Inspection Record Card- Fire | 10/3/2007 | | 10/3/2007 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/3/2007 | | DONE |
|
|
|
|
Issue and Print Permit | | | 10/3/2007 | | DONE |
|
|
|
|
Sprinkler Plan Check | 9/19/2007 | | 9/28/2007 | | PASS |
|
|
|
Plans are approved by bryan Johnson
|
Plan resubmittals received | | | 9/19/2007 | | |
|
|
|
received letter of transmittal from treasure valley & app. also "4" sets of plans- (62) pages with app & fire calcs-- plans put on shelf for fire review
|
Plan resubmittals received | | | 8/30/2007 | | |
|
|
|
"5" sets of plans with each set including FP-1 & FP-2 "1" fire spr app & letter of transmittal from treasure valley--1 page of comments, 1 united water comment page, (58) pages of calculation summary, --plans taken to Scott Arellano
|
Meeting | | | 8/10/2007 | | DONE |
|
|
|
Sam, I talked with Ron this am. They agreed to the 2nd proposal. He is going to talk to one of his suppliers who also sells retardant treatments. He is also going to talk to the owner to make sure the owner is agreeable to this solution and to the retreating the wood at the intervals recommended by the manufacturer of the product they end up using. I told Ron, FIRE would put a note in on our annual inspection file that our inspector who check on that at every inspection. Once he finds a product and talks with the owner he is going to get back with you so we can do a letter for the file that documents what we agreed to. Renn
|
Meeting | | | 8/8/2007 | | DONE |
|
|
|
Based on an onsite inspection of the covered entryway by Chief Ross, Chief Hanneman and myself, it was decided to give the contractor two options: 1. Install a flat ceiling within 6" above the sprinkler head (i.e. within the listed head spacing limits) and completely fill the concealed space with stable insulation batting (which will not compress over time and leave an air void); which makes the installed head location and orientation meet Code. OR,
2. If the owner agrees to accept the responsibility for ongoing maintenance, we would allow them to apply an approved fire retardant coating having approximately the same fire retardant characteristics as the existing stucco siding, to the exposed wood beams and roof deck within this entry porch/enclosures. The owner would then be responsible to apply repeat coatings at the intervals specified by the manufacturer.
|
INSP-Sprinkler Rough-in/Hydro | 6/8/2007 | 6/8/2007 | 6/8/2007 | P | PASS |
Troy Cobbley
|
|
|
Above ground hydro test passed.
|
INSP-Sprinkler Rough-in/Hydro | 6/7/2007 | 6/7/2007 | 6/7/2007 | P | FAIL |
Troy Cobbley
|
|
|
Above ground hydro test failed.
|
INSP-Sprinkler Rough-in/Hydro | 5/31/2007 | 6/1/2007 | 6/1/2007 | A | PART |
Troy Cobbley
|
|
|
See the city approved plans for locations where sprinklers need to be added and insulation reattached to the roof deck. The sidewall sprinklers at the main entrance are too far from the deck. As-builts need to resubmitted showing the added line in the dining/remote area.
|
INSP-Final Inspection | 5/4/2007 | 5/4/2007 | 5/4/2007 | P | PART |
Troy Cobbley
|
|
|
A temporary occupancy was given by dave hanniman for the new areas to be occupied while the fire alarm and fire sprinkler systems are finished being installed.
|
INSP-Final Inspection | 5/4/2007 | 5/4/2007 | 5/4/2007 | P | CANC |
Troy Cobbley
|
|
|
Phone #: ###-#### Internet Inspection Request from: Jeff Packham Inspection cancelled from web by: Jeff Packham
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/19/2007 | | DONE |
|
|
|
|
Telephone call | | | 4/19/2007 | | DONE |
|
|
|
lft vm for jeff packham ###-#### that permit and fees are ready to be picked up
|
Permit Ready to Issue | | | 4/19/2007 | | DONE |
|
|
|
|
Issue and Print Permit | | | 4/19/2007 | | |
|
|
|
|
Inspection Record Card- Fire | 4/19/2007 | | 4/19/2007 | | DONE |
|
|
|
|
Sprinkler Plan Check | 4/6/2007 | | 4/16/2007 | | PASS |
|
|
|
Approved by Bryan Johnson
|
FIR-Aging Inspection | 10/12/2006 | 10/12/2006 | 10/12/2006 | | NR |
Troy Cobbley
|
|
|
work is in progress per Jeff
|
Plan assigned to (Bill) | 6/30/2006 | | 7/13/2006 | | DONE |
|
|
|
|
Sprinkler Plan Check | 6/30/2006 | | 7/13/2006 | | PASS |
Bill Alexander
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/13/2006 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 7/13/2006 | | 7/13/2006 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 7/13/2006 | | DONE |
|
|
|
|
Issue and Print Permit | | | 7/13/2006 | | DONE |
|
|
|
|
Application received | | | 6/30/2006 | | |
|
|
|
|