INSP-Final Inspection | 8/24/2006 | 8/24/2006 | 8/25/2006 | P | PASS |
Forrest France
|
|
|
Corrections have been made, fire sprinkler permit finaled.
|
Override - Parcel Holds | 1/1/1900 | 1/1/1900 | 8/24/2006 | | |
|
|
|
|
INSP-Sprinkler Rough-in | 8/8/2006 | 8/9/2006 | 8/10/2006 | P | PART |
Forrest France
|
|
|
Overhead rough-in is good for cover at the drop ceiling areas, noted hanger at arm-over for one head in an office is overspaced and an ssu above the office to be removed.
|
Override - Parcel Holds | 1/1/1900 | 1/1/1900 | 8/8/2006 | | |
|
|
|
|
Permit Ready to Issue | | | 7/3/2006 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 7/3/2006 | | 7/3/2006 | | DONE |
|
|
|
|
Telephone call | | | 7/3/2006 | | DONE |
|
|
|
spoke to jeff anderson@###-####/told permit was ready and fee associated with it
|
Issue and Print Permit | | | 7/3/2006 | | |
|
|
|
|
Application received | | | 6/30/2006 | | |
|
|
|
|
Plan assigned to (Scott) | 6/30/2006 | | 6/30/2006 | | DONE |
|
|
|
|
Sprinkler Plan Check | 6/30/2006 | | 6/30/2006 | | PASS |
|
|
|
Review comments attached to plans.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/30/2006 | | |
|
|
|
|
Plan assigned to (Bill) | 6/30/2006 | | | | |
|
|
|
|