Permit Information
Permit NumberFIR06-00487
StatusFinaled
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 8109 W FRANKLIN RD
Project NameSPR CABELA'S T.I.
Customer Number 
ePlanReview 
Description
CABELA'S TENANT IMPROVEMENT * This building is fully fire sprinklered for unlimited area provisions. To modify and add fire sprinkler protection for the interior tenant improvements for a 136,194-ft/2 retail tenant. Fire sprinkler work is related to the installation of a new riser backflow preventer with required forward flow appurtenance, relocate and add upright and pendant heads for added mezzanines, restrooms and diorama's, etc., throughout. System designs were reverified for the added backflow preventer on the systems header, high piled combustible storage, limited height wood pallet and Class IV inrack rack storage. Fire sprinkler work is related to the construction of interior partitions, installation of mezzanines, new restrooms, a small kitchen area and mountain and aquarium fixtures and suspended ceilings. Front canopy construction and dry system modifications were permitted under FIR06-00452. This fire sprinkler work shall comply with IFC 2003, attached review comment and conditions list, as regulated by the Fire Chief. These notes, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. Building rack permit is under BLD06-01824. This permit is attached to building permit: BLD06-01174.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection8/17/20068/17/20068/17/2006PPASS
DetailsTroy Cobbley
Permit finaled
Override - Parcel Holds1/1/19001/1/19008/17/2006  
INSP-Final Inspection8/15/20068/16/20068/16/2006PCANC
DetailsTroy Cobbley
To be rescheduled.
Override - Parcel Holds  8/15/2006  
INSP-Sprinkler Rough-in/Hydro8/1/20068/2/20068/2/2006APART
DetailsForrest France
Hydrostatic test for the new rack sprinklers at three areas is satisfactory, items on previous c/n have been verified for completion, added sprinklers at halo above the mountain are acceptable. Need to perform forward flow, test new tampers at the backflow, noted the ball drip at the FDC is leaking.
INSP-Sprinkler Rough-in8/1/20068/1/20068/2/2006PDEFR
DetailsForrest France
Inspection to be completed 8/2
INSP-Sprinkler Rough-in7/27/20067/28/20067/28/2006PPART
DetailsForrest France
OH rough-in inspection for concealed upright heads at entrance to the bargain cave and EC11 head drops in ceiling tile at retail area as marked on plans are okay to cover. Inspection for heads in racks below walkway in the storage area are acceptable except as marked on plan including missing coverage at one area requiring an additional head, heads at two locations are blocked, one head needs to be replaced due to missing liquid in glass bulb, need to install head guards at all locations where uprights are subject to mechanical damage in the racking system.
Plan assigned to (Bill)7/17/2006 7/24/2006 DONE
DetailsBill Alexander
Sprinkler Plan Check7/17/2006 7/24/2006 PASS
DetailsBill Alexander
PLANS/APPL TAKEN TO FRONT DESK  7/24/2006 DONE
Permit Ready to Issue  7/24/2006 DONE
Telephone call  7/24/2006 DONE
tlk to lily ###-#### that permit and fees are ready to be picked up
Plan resubmittals received  7/17/2006  
DetailsBill Alexander
Plan assigned to (Bill)6/15/2006 7/5/2006 DONE
Sprinkler Plan Check6/15/2006 7/5/2006 PART
DetailsBill Alexander
Re-Submittals Of The Following Items Are Required:
1. Rack area storage between grids #1 thru 2, "C" thru "K" cannot be accepted as designed. This area (calc are #1 and 7) have been designed with the mezzanine deck as a ceiling, and the protection design below the mezzanine level for OH-2 density (misc. storage). The roof also needs verified for 20'-0" storage of class IV commodities, in single row racks with 4'-0" aisles.

2. Include clarification of rack shelves addressed in Design Area #1 throughout.

3. The pallet/rack storage area south of "K", between columns "1 thru "4" needs clarification. Provide the quantity of pallet piles anticipated in this design area verifying for possible IFC building requirements addressed in IFC Chapter 23.

4. Provide forward flow piping and appurtenance for the system riser and include it on the plan.

5. Provide clarification of obstructed construction for Areas 1, 2, 3, 4, 5, 6, 7, 8, 9 and 10.

6. Plan FP-6, System #4 design calc details label needs some corrections.
a. Change 1500-ft/2 to: 2000-ft/2.
b. Change Table 12.9.1.2a to: 12.1.9.1.2(a).

7. Provide a required calculation graph for each system area verifying.

8. Provide head elevation above the floor in the "Sprinkler Head Analysis" reports.

9. Plan FP3, "Camo/Hunting," FP-4 "Casual," has a small room which is not identified and/or protected. Identify and clarify the use of this room.

10. Clarify building column protection, which will be required in all areas of racks where building columns are located within the racks exceeding 12'-0" in height. (NFPA 13-12.3.1.7.1[C])
Miscellaneous action  7/5/2006 DONE
Returned plans for corrections with apporved FIR06-00452 (Canopy).
PLANS/APPL TAKEN TO FRONT DESK  7/5/2006 DONE
Inspection Record Card- Fire7/5/2006 7/5/2006 DONE
Permit Ready to Issue  7/5/2006 DONE
Telephone call  7/5/2006 DONE
lft ms with lily ###-#### that permit and fees are ready to be picked up
Application received  6/15/2006