INSP-Final Inspection | 12/21/2006 | 12/21/2006 | 12/21/2006 | P | PASS |
Forrest France
|
|
|
Plan modification work passed, previous c/n items are complete, inspection passed.
|
Inspection Record Card- Fire | 12/6/2006 | | 12/6/2006 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 12/6/2006 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 12/6/2006 | | 12/6/2006 | | DONE |
|
|
|
|
Telephone call | | | 12/6/2006 | | DONE |
|
|
|
tlk to brodie that permit is ready to be picked up
|
(F) Reprint permit | | | 12/6/2006 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 12/6/2006 | | DONE |
|
|
|
|
Sprinkler Plan Check | 12/5/2006 | | 12/5/2006 | | PASS |
|
|
|
Plan Modification to permit FIR06-00508 Logged by Mike Timmerman.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/5/2006 | | |
|
|
|
Plan Modification Ready For Issue
|
Plan resubmittals received | | | 11/22/2006 | | |
|
|
|
|
INSP-Final Inspection | 11/1/2006 | 11/3/2006 | 11/3/2006 | A | NR |
Forrest France
|
|
|
Pending fire alarm completion.
|
INSP-Final Inspection | 8/14/2006 | 8/15/2006 | 8/15/2006 | A | FAIL |
Forrest France
|
|
|
Need to provide missing hangers at three new arm-overs in the warehouse area, noted the existing riser is not monitored and the dry system main control is shut, ceiling tile adjacent to sprinkler heads in the office area must be reinstalled prior to final.
|
Plan assigned to (Bill) | 7/10/2006 | | 7/25/2006 | | DONE |
Bill Alexander
|
|
|
|
Sprinkler Plan Check | 7/10/2006 | | 7/25/2006 | | PASS |
Bill Alexander
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/25/2006 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 7/25/2006 | | DONE |
|
|
|
|
Telephone call | | | 7/25/2006 | | DONE |
|
|
|
spoke to brodie@###-####/told permit was ready, permit#, project name & address, and fee due
|
Inspection Record Card- Fire | 7/25/2006 | | 7/25/2006 | | DONE |
|
|
|
|
Issue and Print Permit | | | 7/25/2006 | | DONE |
|
|
|
|
Application received | | | 7/10/2006 | | |
|
|
|
|