INSP-Final Inspection | 4/4/2007 | 4/4/2007 | 4/4/2007 | P | PASS |
Forrest France
|
|
|
The remainder of correction notice items have been verified for compliance, final fire alarm inspection passed, permit finaled.
|
INSP-Alarm Testing | 4/3/2007 | 4/3/2007 | 4/3/2007 | P | PART |
Forrest France
|
|
|
See comments per field inspection completed by M. Timmerman.
|
INSP-Alarm Testing | 4/2/2007 | 4/2/2007 | 4/2/2007 | P | FAIL |
Forrest France
|
|
|
See comments per inspection completed by M. Timmerman.
|
INSP-Alarm Testing | 3/30/2007 | 3/30/2007 | 3/30/2007 | P | DEFR |
Forrest France
|
|
|
Field inspection performed by M. Timmerman.
|
Case Summary | | | 3/30/2007 | | |
|
|
|
|
Telephone call | | | 3/30/2007 | | DONE |
|
|
|
Discussion with J. Gilliland and telcon with Alex , Danda Const adn F. France, regarding spk and FA inspections adn current status of work; agreed to having M. Timmerman inspect FA for remainder of afternoon (~1.5 hrs).
|
INSP-Alarm Testing | 3/28/2007 | 3/29/2007 | 3/29/2007 | A | FAIL |
Forrest France
|
|
|
FA inspection for the 4th floor only completed today, some defficiencies corrected while on site, other items in need of repair include non-functional SD 105 in the corridor, one SD at the SW corridor is overspaced, the fire damper at the north hall does not operate correctly, vending area lacks sufficient detector coverage, as-built plans do not show the deletion of two FD's.
|
INSP-Alarm Testing | 3/28/2007 | 3/28/2007 | 3/28/2007 | P | PART |
Forrest France
|
|
|
Sprinkler monitoring only tested today, noted addressing at the WF switches in the riser room to correctly identify the system served.
|
Override - Parcel Holds | | | 3/28/2007 | | |
|
|
|
|
Override - Parcel Holds | | | 3/28/2007 | | |
|
|
|
|
INSP-Alarm Testing | 3/26/2007 | 3/27/2007 | 3/27/2007 | A | NR |
Forrest France
|
|
|
Noted several items in need of correction including location and spacing of initiation and notification devices, cd ratings, manual pull station to be relocated, elevator monitoring, panel must be clear of all sprinkler supervisory signals prior to testing, missing signage at door to the FACP, etc.
|
Alarm Plan Check | 3/26/2007 | | 3/26/2007 | | PASS |
|
|
|
Fire Alarm Review 3rd
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/26/2007 | | |
|
|
|
Ready for Issue
|
Override - Parcel Holds | | | 3/26/2007 | | |
|
|
|
|
Override - Parcel Holds | | | 3/26/2007 | | |
|
|
|
|
Inspection Record Card- Fire | 3/26/2007 | | 3/26/2007 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 3/26/2007 | | |
|
|
|
|
Issue and Print Permit | | | 3/26/2007 | | DONE |
|
|
|
|
Plan assigned to (Mike) | 3/23/2007 | | 3/26/2007 | | PASS |
|
|
|
3/26/2007 13:30:53 MWT - activity updated through activity FIRA22 from case FIR06-00523.
|
Plan resubmittals received | | | 3/23/2007 | | |
|
|
|
Received new application( fire alarm ) 2 fire alarm submittal packages and 2 sets of plans sent to Mike T. in fire ///dld
|
INSP-Conference | 3/20/2007 | 3/21/2007 | 3/21/2007 | A | DONE |
Forrest France
|
|
|
Regarding FA plans matching floorplan.
|
Override - Parcel Holds | | | 3/20/2007 | | |
|
|
|
|
INSP-Conference | 2/21/2007 | 2/22/2007 | 2/22/2007 | A | DEFR |
Forrest France
|
|
|
To be completed 2/23.
|
CHANGE STATUS TO (ISS) | | | 8/31/2006 | | |
|
|
|
no fee due-changed status to issued
|
Alarm Plan Check | 8/16/2006 | | 8/30/2006 | | PASS |
Troy Cobbley
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/30/2006 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 8/30/2006 | | |
|
|
|
|
Permit Ready to Issue | | | 8/30/2006 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 8/30/2006 | | |
|
|
|
|
Inspection Record Card- Fire | 8/30/2006 | | 8/30/2006 | | DONE |
|
|
|
|
Telephone call | | | 8/30/2006 | | DONE |
|
|
|
spoke to rob@###-####/told permit was ready and no fees
|
Miscellaneous action | | | 8/17/2006 | | DONE |
|
|
|
Approved Early Start request from NEI, for scope of work to install alarm panels and pull wire from rooms and corridors to panels.
|
Plan resubmittals received | | | 8/16/2006 | | DONE |
|
|
|
|
Alarm Plan Check | | | 8/8/2006 | | FAIL |
|
|
|
Reviewed by F. Varley. Review faxed to Protex.
|
Plan assigned to (SAM) | 8/3/2006 | | 8/3/2006 | | DONE |
|
|
|
Mailed to FV 8/3 with request to expedite if possible.
|
Application received | | | 7/17/2006 | | |
|
|
|
|
Inspection | 4/3/2007 | 4/3/2007 | | | FAIL |
|
|
|
Check Fire Alarm correction Items noted from inspection on 3/30/2007 and 4/2/2007 and finish alarm testing of project. Most fire alarm problems have been corrected with exception to the following items. Forrest said he would complete.
1.) Check both North West and South East fire smoke dampers not working correctly 4th floor.
2.) Correct descriptor on guest laundry/fitness exit pullstation. Was - East Exit pullstation.
3.) Need NFPA 72s
4.) Building As Built Drawings and Map at FACP and for City
5.) Paint Breaker Red FACP
6.) Check Phone Signals and Phone Line Supervision
1.)
|
Inspection | 4/2/2007 | 4/2/2007 | | | FAIL |
|
|
|
Fire Alarm Inspection 4/2/2007 3rd floor correction check and 2nd and 1st floor inspection. The inspection was performed by Mike Timmerman
3rd Floor Corrections a.) fire damper now closes but reopens on reset. b.) 3rd floor corridor smoke detectors relocated . c.) Cover replaced on elevator lobby notification appliance. d.) Covers removed on 120V smoke detectors. e.) S.W. HC room smoke and horn strobe relocated
Items still to be corrected on 3rd floor from 3/30/inspection are.
1. Corridor notification appliance spacing exceeded south hall.
2. Fire damper opening on silence
3. Elevator recall
4. EOL voltage check
2nd floor correction items 4/2/2007
1. Corridor notification appliance spacing exceeded south hall.
2. Fire damper opening on silence
3. Descriptor needed on D1-72
3. Elevator recall
4. EOL voltage check
1st floor correction items 4/2/2007
1. Notification appliance required in hall behind reception desk.
2. Fire dampers opening on silence
3. Lobby smoke detection inadequate and over spaced.
4. Smoke detector to close to diffuser SE hall
5. Detector to close to diffuser # 40
6. Detector to close to diffuser # 26
7. Main FACP batteries wrong size
8. Check duct detectors not tested
9. Men's Restroom 135 strobe bad
10. Recheck meeting room smoke detector #10 to close to diffuser my let this go if they can make it work
11. Smoke detector buffet room to close to diffuser
12. North corridor smoke detector to close to diffuser
13. Test all EOL 3rd - 1st
14. Descriptor needed on pull station exit to outside
15. Test elevator recall
|
Inspection | 3/30/2007 | 3/30/2007 | | | FAIL |
|
|
|
Fire Alarm Inspection 3/30/2007 4th floor correction verification and 3rd Floor inspection only. The inspection was performed by Mike Timmerman with assistance and help from Sam Rogers.
1. Items noted by Forrest France on 4th floor fire alarm inspection have been corrected. Found new fourth floor correction items to be corrected a.) long corridor notification spacing exceeded. b.) Fire smoke dampers re-open on fire alarm silence not reset.
2. Fire smoke damper not closing N W corridor.
3. Corridor smoke detector spacing needs to be corrected.
4. Cover missing on notification appliance elevator lobby.
5. Elevators not functional so they need to be tested.
6. Remove covers found on 120V smoke detectors.
7. South West HC Room notification appliance wrong location.
8. South West HC Room smoke detector mounted above restroom door.
9. Fire dampers re-open on silence not reset.
10. Check Battery Size.
11. Corridor notification appliance spacing exceeded south hall.
12. EOL voltage to be tested.
|
Alarm Plan Check | 3/26/2007 | | | | FAIL |
|
|
|
Fire Alarm Resubmittal Due to Project Floor Plan Changes.
|
Inspection Record Card- Fire | 3/26/2007 | | | | |
|
|
|
|