INSP-Final Inspection | 4/5/2007 | 4/5/2007 | 4/5/2007 | P | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Sprinkler Rough-in/Hydro | 1/4/2007 | 1/4/2007 | 1/4/2007 | P | PART |
Forrest France
|
|
|
OH hydrostatic test for the new 3" main and new branch lines completed okay.
|
INSP-Sprinkler Rough-in/Hydro | 12/18/2006 | 12/18/2006 | 12/18/2006 | P | PASS |
Troy Cobbley
|
|
|
Hydro test for the canopy passed.
|
INSP-Sprinkler Rough-in/Hydro | 12/14/2006 | 12/14/2006 | 12/14/2006 | P | FAIL |
Troy Cobbley
|
|
|
Hydro test failed. Leaking at heads.
|
Plan assigned to (Bill) | 7/18/2006 | | 10/27/2006 | | PASS |
|
|
|
10/27/2006 12:11:09 MWT - activity updated through activity FIRA22 from case FIR06-00821.
|
INSP-Sprinkler Rough-in | 9/27/2006 | 9/28/2006 | 9/28/2006 | A | PASS |
Troy Cobbley
|
|
|
Additional area of the canopy is ok to cover. See approved plan for location.
|
INSP-Sprinkler Rough-in/Hydro | 9/20/2006 | 9/21/2006 | 9/21/2006 | A | PASS |
Troy Cobbley
|
|
|
This inspection was for the maintenance shop addition. The tie-in, earthquaking and the sidewall head under the overhead door has been finished.
|
INSP-Sprinkler Rough-in/Hydro | 9/19/2006 | 9/19/2006 | 9/19/2006 | P | PASS |
Troy Cobbley
|
|
|
Above ground hydro test and rough-in inspection for the maintenance shop addition is passed.
|
INSP-Sprinkler Rough-in/Hydro | 9/6/2006 | 9/6/2006 | 9/6/2006 | P | PASS |
Troy Cobbley
|
|
|
See the city approved plans for the canopy piping that was inspected.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/21/2006 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 8/21/2006 | | |
|
|
|
|
Permit Ready to Issue | | | 8/21/2006 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 8/21/2006 | | |
|
|
|
|
Inspection Record Card- Fire | 8/21/2006 | | 8/21/2006 | | DONE |
|
|
|
|
Telephone call | | | 8/21/2006 | | DONE |
|
|
|
spoke to jeff@###-####/told permit was ready, permit#, project name & address, and fee
|
Override - Parcel Holds | | | 8/21/2006 | | |
|
|
|
|
Issue and Print Permit | | | 8/21/2006 | | |
|
|
|
|
Sprinkler Plan Check | | | 8/13/2006 | | PASS |
|
|
|
Approved by B. Johnson.
|
Application received | | | 7/18/2006 | | |
|
|
|
|
Case Summary | | | 7/18/2006 | | DONE |
|
|
|
|