INSP-Final Inspection | 8/17/2006 | 8/18/2006 | 8/18/2006 | A | PASS |
Forrest France
|
|
|
Final fire sprinkler inspection passed, permit finaled.
|
INSP-Sprinkler Rough-in/Hydro | 7/27/2006 | 7/28/2006 | 7/28/2006 | P | PART |
Forrest France
|
|
|
OH rough-in is acceptable for cover at the hard lid and drop ceiling areas.
|
Plan assigned to (Bill) | 7/18/2006 | | 7/24/2006 | | DONE |
|
|
|
|
Sprinkler Plan Check | 7/18/2006 | | 7/24/2006 | | PASS |
Bill Alexander
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/24/2006 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 7/24/2006 | | 7/24/2006 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 7/24/2006 | | DONE |
|
|
|
|
Telephone call | | | 7/24/2006 | | DONE |
|
|
|
tlk to receptionist for randy bowron ###-#### that permit and fees are ready to be picked up
|
Issue and Print Permit | | | 7/24/2006 | | DONE |
|
|
|
|
Application received | | | 7/18/2006 | | |
|
|
|
|